My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-107 <br />1-08.3(2)B Baseline Schedule <br />The progress schedule submitted to the City’s Representative and City after their <br />review of the Preliminary Schedule shall be the Baseline Schedule. The Baseline <br />Schedule shall be the baseline schedule against which all future schedules are <br />compared and updated, and job progress is measured. The Baseline Schedule <br />shall not be reset or changed without the written agreement of City’s <br />Representative and City. <br />1-08.3(2)C Updates <br />Contractor shall submit with each application for payment or progress pay <br />estimate an updated progress schedule, but no less often than monthly. If <br />requested by City’s Representative or the City, Contractor shall prepare and <br />submit updated progress schedules from time to time, which may be more <br />frequent than monthly. <br />An updated progress schedule shall identify progress of the Project or Work to the <br />date of submission. It shall include, but not be limited to: (1) identification of all <br />actual start and completion dates occurring prior to the submission of the <br />schedule; (2) comparison of actual start and completion dates to the planned start <br />and completion dates shown on the Baseline Schedule; and (3) comparison of <br />expected start and completion dates for work to occur after submission updated <br />progress schedule to the planned start and completion dates shown on the <br />Baseline Schedule. Work remaining to be completed at the end of a period for an <br />activity should show the remaining duration required to complete that activity. The <br />percent complete for that activity should also be shown. If during the course of <br />construction the Contractor desires or feels it necessary to make changes in the <br />schedule logic, these changes should be identified, highlighted, and specifically <br />and expressly brought to the attention of the City’s Representative and City along <br />with the schedule update. <br />An updated progress schedule shall show changes occurring since submission of <br />the previous updated progress schedule such as: <br />1. Major changes in scope; <br />2. Activities modified since previous submission; <br />3. Revised projection for construction completion, as applicable; and <br />4. Any other changes. <br />Contractor shall submit an updated progress schedule for review by the City and <br />City’s Representative, at the weekly construction meeting or as otherwise as <br />requested by City’s Representative or City. Any deviation from the Baseline <br />Schedule shall be explained by the Contractor, including the cause and effect of <br />the deviation. Contractor shall state in writing the corrective measures it will take <br />to bring the progress of the Work back in line with the Baseline Schedule. <br />Once an actual start or completion date is stated in a submitted progress <br />schedule, Contractor shall not change schedule without prior written agreement of <br />the City and City’s Representative. <br />With each submitted updated progress schedule, Contractor shall provide a <br />written narrative report that identifies anticipated or actual deviations from the <br />Baseline Schedule, causes of the deviations, and the impact of the deviations on <br />the schedule and describes the corrective action taken or proposed, and its effect. <br />1-08.3(3) Schedule Updates <br />Delete 1-08.3(3) and substitute the following:
The URL can be used to link to this page
Your browser does not support the video tag.