Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-108 <br />1-08.3(3) Schedule Format And Content <br />(******) <br />1-08.3(3)A Schedule Format <br />All schedules shall be in the following form: <br />1. Network analysis system using the current version of Microsoft Project <br />software (or other software acceptable to the City Representative) and <br />the critical path method, as outlined in The Associated General <br />Contractors of America (AGC) publication "The Use of CPM in <br />Construction -A Manual for General Contractors.” <br />2. Sequence of Listings: The chronological order of the start of each activity <br />of Work. Listings on Progress Schedule and Schedule of Values shall be <br />the same. <br />3. Scale and Spacing: To provide space for notations and revisions. <br />4. Each schedule and update shall be provided in three (3) paper copies <br />and one electronic copy in current Microsoft Project format (or other <br />format acceptable to the City Representative). Paper copies shall be on a <br />single sheet of paper and of sufficient size to allow legibility of schedule. <br />Pieces of the schedule on separate sheets of paper that must be taped <br />together to form schedule are not permitted. Electronic copies shall be <br />submitted on either separate CD-ROMs or as email attachment to City’s <br />Representative or as otherwise acceptable to the City Representative. <br />5. Updated Progress Schedules shall indicate progress of the Work to the <br />date of submission by drawing a vertical line down the schedule to <br />represent Work completed to date. <br />1-08.3(3)B Schedule Contents <br />All Progress Schedules shall: <br />1. Include essential sub-schedules of related activities. <br />2. Allow for timely incorporation of any other's work under separate contract <br />with City. <br />3. Allow for timely incorporation of work provided and installed by City. <br />4. Include submittals to agencies required for performance of Work with <br />sufficient, adequate and reasonable time for review, comment and return <br />submittals. <br />5. Allow for appropriate durations to complete activities that may be affected <br />by weather during the time of year the activities are performed. <br />6. Identify logical connections, dependency upon preceding or succeeding <br />activities, restraints or constraints, planned start and completion dates, <br />duration, actual start and completion dates, and variances. <br />7. Activity durations shall not exceed twenty (20) days. The activities shall <br />be related to early and late start, early and late finish, and Float dates. <br />Activities listed in the Preliminary Schedule shall be included in all subsequent <br />schedules. No activity in the Preliminary Schedule shall be deleted without prior <br />written consent of the Representative and City. <br />Contractor shall notify City’s Representative and City in writing and highlight the <br />addition of all activities to the schedule after the Preliminary Schedule. <br />The Baseline Schedule shall be part of the Contract. <br />Each activity shall be identified with a number that incorporates the Specification <br />section number.