CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-109 <br />Activities shall be consistent and identified with the Schedule of Values (if <br />applicable) or unit prices of the bid schedule. All elements and items in the <br />Schedule of Values or unit prices in the bid schedule shall appear in the Progress <br />Schedules. <br />Contractor shall provide sub-schedules for each stage/phase of Work as required <br />by City, City’s Representative, or Subcontractor. <br />Contractor shall provide sub-schedules to define major portions of the entire <br />schedule. Include long-lead-time items for Equipment and material that requires <br />long fabrication time. Order these well in advance of required delivery time to <br />sequence with overall construction schedule. <br />Each schedule shall show accumulated percentage of completion of each activity, <br />and total percentage of Work completed, as of the date of payment application. <br />Contractor shall include in each schedule as activities the submission, review, and <br />correction of Submittals, Shop Drawings, Product Data and Samples. The <br />schedule should show: <br />1. The dates for Contractor's Submittals. <br />2. A minimum of 14 calendar days duration for City or City’s <br />Representative’s review. <br />3. Indicate decision data for selection of finishes. <br />4. Show Submittal preparation, submission, review, and breakdown at a <br />minimum. Show individual parts of major Submittals. <br />Contractor shall identify any and all Work furnished by City and installed by City <br />on the construction schedule. <br />1-08.3(4) Measurement <br />Delete 1-08.3(4). <br />1-08.3(5) Payment <br />Delete 1-08.3(5) and substitute the following: <br />Costs incurred in performance of this Work shall be included in the contract bid <br />items and no direct compensation shall be paid. <br />1-08.4 Prosecution of Work <br />Delete 1-08.4 and substitute the following: <br />1-08.4 Notice to Proceed and Prosecution of Work <br />(******) <br />The City will issue a Notice to Proceed after the Contract has been executed and the <br />Contract Bonds and evidence of insurance have been approved and filed by the City. The <br />Contractor shall not commence with the Work until the Notice to Proceed has been given <br />by the City. The Contractor shall commence construction activities on the Project site within <br />14 calendar days of the Notice to Proceed Date, unless otherwise approved in writing. The <br />Contractor shall diligently pursue the Work to the Physical Completion Date within the time <br />specified in the Contract. Voluntary shutdown or slowing of operations by the Contractor <br />shall not relieve the Contractor of the responsibility to complete the Work within the time(s) <br />specified in the Contract. <br />The City is not obligated to accept or pay for Work performed by the Contractor or be liable <br />for any Delays, prior to delivery of the Notice to Proceed. The City’s knowledge of Work <br />being performed prior to delivery of the Notice to Proceed will not obligate the City to <br />accept or pay for such Work. Contractor waives any and all Contract Claims for an <br />adjustment of Contract Sum or Contract Time arising out of, or related to, Work it performs <br />prior to receipt of the Notice to Proceed.