Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div B – BID ITEM DESCRIPTIONS March 2024 <br />Work Order No. UP 3814 SP-30 <br />Bid Item A18, B16, C17, D15 - Foundation Material, Class A or B <br />Specification Section 2-03 <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for Foundation Material, Class A or B shall be by the ton, recorded on certified <br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of <br />dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or COE <br />Standard Drawings, or as otherwise approved by the Engineer. <br />The unit price bid per ton shall constitute full compensation for all labor, tools, materials and <br />equipment required to furnish, place, and compact foundation material as specified in the <br />Standard Specifications, these Special Provisions and as shown on COE Standard Drawing No. <br />614. <br />The unit price for this bid item includes all costs for dewatering and over -excavation, removal, <br />haul, and disposal of unsuitable subgrade material below the pipe zone or roadway subgrade. <br />Bid Item A19, B17, C18 - Gravel Borrow Incl. Haul <br />Specification Section 2-03 <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br />accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of dimensions <br />defined in the Work, descriptions for other bid items, shown on the Plans, or COE Standard <br />Drawings, or as otherwise approved by the Engineer. <br />Gravel borrow shall be limited to maximum trench widths defined in the work descriptions for <br />other bid items. <br />The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br />compensation for all labor, material, tools and equipment necessary to furnish imported gravel <br />borrow for trench backfill where Engineer has determined native soils are not suitable for backfill, <br />and other Work as required, from a Contractor-supplied source in accordance with 2-03.3(14)J of <br />the Standard Specifications and these Special Provisions. <br />The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, placing, <br />grading and compacting the material in place. <br />The unit price for this bid item includes all costs for removing, loading and disposing of displaced <br />unsuitable material, including haul. <br />Bid Item A20, B18, C19 - Crushed Surfacing Base Course <br />Specification Section 4-04 <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for crushed surfacing base course will be by the ton as recorded on certified weight <br />tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions defined in <br />the Work, descriptions for other bid items, shown on the Plans, details or COE Standard <br />Drawings or as otherwise approved by the Engineer. In addition to surfacing, this product will be <br />paid by the ton for aggregate base course of curb/concrete sidewalk/concrete driveway. Crushed <br />Surfacing Base Course material placed exceeding “neatline” limits without advance authorization <br />by the Inspector will not be paid for. <br />The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br />equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br />surfacing base course for the Work as required, from a Contractor supplied source in accordance <br />with these Special Provisions. <br />The unit price for crushed surfacing base course also includes all costs for controlling moisture <br />content and all costs for dewatering.