CITY OF EVERETT SPECIAL PROVISIONS
<br />
<br />Water Main Replacement “Y” – Ph 1 Div B – BID ITEM DESCRIPTIONS March 2024
<br />Work Order No. UP 3814 SP-30
<br />Bid Item A18, B16, C17, D15 - Foundation Material, Class A or B
<br />Specification Section 2-03
<br />Measurement and Payment: Unit Price per Ton (TON)
<br />Measurement for Foundation Material, Class A or B shall be by the ton, recorded on certified
<br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of
<br />dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or COE
<br />Standard Drawings, or as otherwise approved by the Engineer.
<br />The unit price bid per ton shall constitute full compensation for all labor, tools, materials and
<br />equipment required to furnish, place, and compact foundation material as specified in the
<br />Standard Specifications, these Special Provisions and as shown on COE Standard Drawing No.
<br />614.
<br />The unit price for this bid item includes all costs for dewatering and over -excavation, removal,
<br />haul, and disposal of unsuitable subgrade material below the pipe zone or roadway subgrade.
<br />Bid Item A19, B17, C18 - Gravel Borrow Incl. Haul
<br />Specification Section 2-03
<br />Measurement and Payment: Unit Price per Ton (TON)
<br />Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in
<br />accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of dimensions
<br />defined in the Work, descriptions for other bid items, shown on the Plans, or COE Standard
<br />Drawings, or as otherwise approved by the Engineer.
<br />Gravel borrow shall be limited to maximum trench widths defined in the work descriptions for
<br />other bid items.
<br />The unit price per ton, based on certified weight tickets, for gravel borrow shall be full
<br />compensation for all labor, material, tools and equipment necessary to furnish imported gravel
<br />borrow for trench backfill where Engineer has determined native soils are not suitable for backfill,
<br />and other Work as required, from a Contractor-supplied source in accordance with 2-03.3(14)J of
<br />the Standard Specifications and these Special Provisions.
<br />The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, placing,
<br />grading and compacting the material in place.
<br />The unit price for this bid item includes all costs for removing, loading and disposing of displaced
<br />unsuitable material, including haul.
<br />Bid Item A20, B18, C19 - Crushed Surfacing Base Course
<br />Specification Section 4-04
<br />Measurement and Payment: Unit Price per Ton (TON)
<br />Measurement for crushed surfacing base course will be by the ton as recorded on certified weight
<br />tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions defined in
<br />the Work, descriptions for other bid items, shown on the Plans, details or COE Standard
<br />Drawings or as otherwise approved by the Engineer. In addition to surfacing, this product will be
<br />paid by the ton for aggregate base course of curb/concrete sidewalk/concrete driveway. Crushed
<br />Surfacing Base Course material placed exceeding “neatline” limits without advance authorization
<br />by the Inspector will not be paid for.
<br />The unit price per ton shall be full compensation for all labor, compaction, material, tools, and
<br />equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed
<br />surfacing base course for the Work as required, from a Contractor supplied source in accordance
<br />with these Special Provisions.
<br />The unit price for crushed surfacing base course also includes all costs for controlling moisture
<br />content and all costs for dewatering.
|