Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div B – BID ITEM DESCRIPTIONS March 2024 <br />Work Order No. UP 3814 SP-33 <br />6. Removal and disposal of the existing water main pipe and fittings within the limits of the <br />installed temporary water main. <br />7. Protection and maintenance of temporary water main until such time the new permanent <br />water main is installed, tested, approved by the engineer, and activated. <br />8. Provide rubber ramps for private property access and protection to temporary pipe. <br />9. Disassembly and removal of the temporary water main system. <br />Bid Item B22 - Gate Valve, 2-inch <br />Bid Item A25, B23, C23, D19 - Gate Valve, 6-Inch <br />Bid Item A26, B24, C24 - Gate Valve, 8-Inch <br />Bid Item B25, D20 - Gate Valve, 12-Inch <br />Specification Section 7-12 <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit contract price for valves shall constitute full compensation for all labor, materials, tools <br />and equipment necessary and incidental to furnish and install valves complete in place on the <br />watermain, including but not limited to, dewatering; removal and disposal of existing curb and <br />gutter, and sidewalk; excavation, removal, hauling, and disposal of excavated materials; <br />furnishing, jointing, and installing valves and valve boxes with extensions if necessary; installing <br />temporary concrete thrust blocks; restraint systems; painting; flushing and disinfecting; furnishing, <br />installing, compacting, and testing bedding and backfill materials; constructing asphalt concrete <br />pad around valve box if necessary; cleanup; and any additional work, materials, and equipment <br />required to install the valves and assembly, except as included in other unit price bids. <br />Bid Item A27, B26, C25 - Fire Hydrant <br />Specification Section 7-14 <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit price per each shall be full compensation for all work to furnish and install fire hydrant in <br />accordance with Parts B, C, E, F, I, and J noted in COE Standard Drawing No. 507. Work <br />includes, yet not limited to, all costs for clearing and grubbing; excavation, removal, haul and <br />disposal of excavated materials; furnishing, installing, testing, and disinfecting new fire hydrant; <br />shoring; dewatering; furnishing, installing and compacting bedding and backfill materials; and <br />plastic film wrap required for the complete installation of the hydrant as specified. <br />Bid Item A28, B27, C26 - Remove Ex Fire Hydrant <br />Specification Section 7-14 <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit contract price for Remove Ex Fire Hydrant shall constitute full compensation for all labor, <br />materials, tools and equipment necessary for removal of structures or obstructions not specifically <br />covered under other Bid Items, excavation and dewatering, removing and disposal of the existing <br />hydrant assembly, valves, and connected piping. <br />Bid Item A29, B28, C27, D21 - Assist COE in Connecting to Existing Watermain <br />Specification Section 7-09 <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit contract price to Assist COE in Connecting to Existing Watermain shall constitute full <br />compensation for all labor, materials, tools and equipment necessary for connection to existing <br />system, in accordance with 7-09.3(19)A including, yet not limited to; all costs for traffic control, <br />excavation, shoring, dewatering, haul and disposal of excavated materials, furnishing all required <br />water pipe and fittings, furnishing, installing and compacting bedding and backfill materials; labor <br />and equipment required for the complete installation of the connection as specified.