My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div B – BID ITEM DESCRIPTIONS March 2024 <br />Work Order No. UP 3814 SP-35 <br />concrete sidewalk removal; clearing and grubbing; testing; connection to existing service line <br />including fittings and new pipe matching existing diameter and material; dewatering; and removal <br />or abandonment of existing service connection. <br />Bid Item A32, B34 - Relocate Existing Water Meter, Setter and Box <br />Specification Section 7-15 <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit contract price for Relocate Existing Water Meter, Setter and Box shall constitute full <br />compensation for all labor, materials, tools and equipment necessary to relocate existing water <br />meter to new location and reconnect with the existing service line, including yet not limited to, <br />excavation, hauling and disposition of surplus materials, backfill, removal and replacement of <br />surface structure encountered, salvaging the existing meter box, reconnection and adjustment of <br />yard piping of correct type and size to complete the connection between the relocated existing <br />meter and new meter box, and the existing yard piping. <br />Bid Item A33, B35, C31 - Topsoil, Type A and Seeding <br />Specification Section 8-02 <br />Measurement and Payment: Unit Price per Square Yard (SY) <br />Measurement for providing [6-inch thick] Topsoil, Type A shall be limited to dimensions and work <br />limits defined in the work descriptions for other bid items, shown on the Plans, details or COE <br />Standard Drawings or as otherwise approved by the Engineer. The unit price per square yard for <br />Topsoil, Type A & Seeding shall be full compensation for all labor, compaction, material, tools, <br />and equipment necessary to provide compacted 6 inches thick imported Topsoil, Type A for the <br />Work as required, from a Contractor-supplied source in accordance with the Standard <br />Specifications and these Special Provisions. <br />The unit price for Topsoil, Type A & Seeding includes all costs for hauling, stockpiling, placing, <br />grading, compacting, seeding, and controlling moisture content. <br />Also to be included in this bid item shall be the cost of all subgrade preparation and grader work, <br />or any other equipment required to establish correct surfaces to proper grade before the topsoil is <br />placed, as well as all equipment required to spread and compact the topsoil uniformly on the <br />surface to be seeded. Also included shall be the costs for removing, loading, hauling, and <br />disposing of unsuitable or displaced materials. <br />Include cost of sprinkling during dry periods prior to placement of the topsoil and while spreading <br />and compacting the material along with turf establishment in the unit price for this bid item. <br />Payment for Topsoil, Type A & Seeding will be determined by the square yard as measured in <br />place. <br />Bid Item A34 - Monument Case and Cover <br />Specification Section 8-13 <br />Measurement and Payment: Unit Price per Each (EA) <br />The unit price per each for monument case shall be full compensation for furnishing and placing <br />the survey monument and monument case and cover, in accordance with the COE Standard <br />Drawings, Standard Specifications and these Special Provisions, in conformity with the lines and <br />locations shown on the Plans. Any cost associated with application and permits to <br />remove/destroy survey monument and reestablish new survey monument are considered as <br />incidental to this Bid Item. Department of Natural Resources Application and Permit will be <br />required to be prepared by a Licensed Professional.
The URL can be used to link to this page
Your browser does not support the video tag.