Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div B – BID ITEM DESCRIPTIONS March 2024 <br />Work Order No. UP 3814 SP-36 <br />Bid Item A35, B36, C32, D22 - Temporary Roadway Surfacing <br />Specification Section 5-06 <br />Measurement and Payment: Lump Sum (LS) <br />No measurement will be made for the lump sum item Temporary Roadway Surfacing. <br />Payment for the lump sum item Temporary Roadway Surfacing shall be a one-time lump sum <br />regardless of how many times Temporary Roadway Surfacing is placed, removed, replaced, or <br />relocated. The lump sum price shall be full compensation for all labor, material, tools and <br />equipment necessary to satisfactorily complete the Work as defined in Section 5-06.3(6) of these <br />Special Provisions and as shown on the Plans. <br />Bid Item A36, B37, C33, D23 - Crushed Surfacing Top Course <br />Specification Section 4-04 <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for crushed surfacing top course will be by the ton as recorded on certified weight <br />tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions defined in <br />the Work, descriptions for other bid items, shown on the Plans, details or COE Standard <br />Drawings or as otherwise approved by the Engineer. Crushed Surfacing Top Course material <br />placed exceeding “neatline” limits without advance authorization by the Inspector will not be paid <br />for. <br />The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br />equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br />surfacing top course for the Work as required, from a Contractor supplied source in accordance <br />with the Standard Specifications and these Special Provisions. <br />The unit price for crushed surfacing top course also includes all costs for controlling moisture <br />content. <br />Also included in this bid item shall be the cost of all equipment required to remove existing soils <br />to attain proper elevations, compaction of native subgrade soils, as well as to uniformly spread <br />and compact the crushed surfacing material. <br />The unit price for this bid item includes all costs for removing, loading and disposing of displaced <br />unsuitable material, including haul. <br />Include in this bid item the cost of sprinkling during dry periods prior to placement of the crushed <br />surfacing and while spreading and compacting the material. <br />Payment for crushed surfacing top course will be by the ton for permanent trench patch, <br />additional base material required for concrete panel at Madrona Ave, and material placed and <br />approved by the Inspector. <br />Bid Item A37, B38, C34, D24 - HMA, CL 1/2” PG 64-22 for Permanent Trench Patch <br />Specification Section 5-04 <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for HMA, CL 1/2” PG 64-22 shall be by the ton, recorded on certified weight tickets <br />in accordance with 1-09.2 WEIGHING EQUIPMENT for HMA placed within the limits of <br />dimensions defined in the Work or shown on the Plans, Standard Specifications, Section 5-06 of <br />these Special Provisions, or as otherwise approved by the Engineer. The measurement and <br />payment limits for measuring the width of this bid item shall not exceed the saw-cut limits shown <br />on the Drawings. No deduction will be made for the weight of asphalt binder, blending sand, <br />mineral filler, or other component of the mixture. <br />The unit price for this bid item shall include all labor, materials, equipment and related work <br />necessary to furnish, machine-place, compact, roll and perform density tests on multiple lifts of <br />HMA – CL 1/2” PG 64-22 pavement including streets, alleys, street crossings, and driveway <br />aprons as shown on the Plans.