Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-53 <br />5. Certification of Wage Compliance. Within the three-year period immediately <br />preceding the date of the bid solicitation, not have been determined by a final and <br />binding citation and notice of assessment issued by the department of labor and <br />industries or through a civil judgment entered by a court of limited or general <br />jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of <br />chapter 49.46, 49.48, or 49.52 RCW. <br />6. Apprentices. If the Project is subject to the apprenticeship utilization requirements <br />in RCW 39.04.320, not have been found out of compliance by the Washington state <br />apprenticeship and training council for working apprentices out of ratio, without <br />appropriate supervision, or outside their approved work processes as outlined in <br />their standards of apprenticeship under chapter 49.04 RCW for the one-year period <br />immediately preceding the date of the bid solicitation. <br />1-02.1(2) Supplemental Bidder Responsibility Criteria <br />(******) <br />This Project will not be subject to supplemental bidder responsibility criteria. <br />1-02.2 Plans and Specifications <br />Delete all paragraphs in 1-02.2 and substitute the following: <br />Information as to where Bid Documents can be obtained or reviewed will be found in <br />the Call for Bids (Advertisement for Bids) for the Work. <br />After Award of the Contract, the Contractor will receive up to six sets of the reduced <br />Plans (11" x 17") and accompanying Special Provisions. In addition, the City will supply <br />up to three sets of full size plans (22" x 34"). All Plans and Special Provisions will be <br />conformed with addenda unless Contractor requests otherwise. <br />Additional Plans and Special Provisions may be purchased by payment of the current <br />printing costs. <br />1-02.4 Examination of Plans, Specifications, and Site of Work <br />1-02.4(1) General <br />Delete the fifth paragraph of 1-02.4(1), beginning with “Bid prices shall reflect”, and <br />substitute the following: <br />Bid prices shall include everything necessary for the completion of the Work <br />including, but not limited to, providing the materials, equipment, tools, plant and <br />other facilities, and the management, superintendence, labor, and all necessary <br />testing services. <br />Revise the first sentence in the paragraph that begins with “Any prospective Bidder <br />desiring an explanation” to read as follows: <br />Any prospective Bidder desiring an explanation or interpretation of the Bid <br />Documents, shall request the explanation or interpretation in writing by close of <br />business three business days preceding the bid opening to allow a written reply to <br />reach all prospective Bidders before the submission of their Bids. <br />Supplement 1-02.4(1) by adding the following: <br />Bidder acknowledges that Bidder has not relied on representation or warranty of <br />the City not expressly included in the Contract Documents. <br />The information provided by the City is not intended to be a substitute for, or a <br />supplement to, the independent verification by Bidder to the extent such <br />independent investigation of the Drawings and Specifications or Site conditions is <br />deemed necessary or desirable by the Bidder. Bidder acknowledges that they <br />have not relied upon City or Engineer furnished information regarding site <br />conditions in preparing and submitting a Bid. <br />Further supplement 1-02.4(1) by adding the following: