My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-54 <br />1-02.4(1)A Interpretation of Contract Documents <br />(******) <br />Should a Bidder find what is believed to be discrepancies in or omissions from the <br />Plans, Specifications, or Special Provisions, or should the Bidder be in doubt as to <br />their meaning, Bidder may submit to the Engineer a written request for an <br />interpretation thereof. The Bidder submitting the request will be responsible for its <br />prompt delivery. Any interpretation of the documents, if made, will be made only by <br />addendum duly issued and a copy of such addendum will be mailed or delivered <br />to each Bidder receiving a set of such documents. All requests for <br />interpretations must be received by the City or Engineer no later than 7 <br />calendar days prior to the Bid Opening Date. All questions regarding the <br />Contract Documents shall be referred to the City or Engineer at the address <br />provided in the Contract Documents. <br />1-02.4(1)B Prevailing Wages <br />(******) <br />Bidder is directed to 1-07.9(1) of these Special Provisions for requirements <br />regarding applying payment of prevailing wage rates for employment of labor on <br />within Snohomish County. <br />1-02.4(2) Subsurface Information <br />Delete the first paragraph and substitute the following: <br />If the City has made subsurface investigation of the site of the proposed Work, the <br />boring log data and soil sample test data accumulated by the City will be made <br />available for inspection by the Bidders. The boring logs and soil sample test data <br />shall NOT be considered as part of the Contract, regardless of whether such data <br />is supplied as an Appendix to the Special Provisions or not. In addition, the City <br />makes no representation or warranty expressed or implied that: <br />1. The Bidders’ interpretations from the boring logs are correct, <br />2. Moisture conditions and indicated water tables will not vary from those <br />found at the time the borings were made, and <br />3. The ground at the location of the borings has not been physically <br />disturbed or altered after the boring was made. <br />The City specifically makes no representations, guarantees, or warranties as to <br />the condition, materials, or proportions of the materials between the specific <br />borings regardless of any subsurface information the Contracting Agency may <br />make available to the prospective Bidders. <br />Supplement 1-02.4(2) by adding the following: <br />The boring log data and soil sample data, if any, can be found in Appendix _. <br />If there is a geotechnical report made by the City, Bidder may contact City of <br />Everett Project Manager to arrange to view the geotechnical report. <br />The availability of subsurface information from the City shall not relieve the Bidder <br />or the Contractor from risks or of their duty to make examinations and <br />investigations as required by Section 1-02.4(1) or other responsibility under the <br />Contract or as may be required by law. <br />1-02.5 Proposal Form <br />Delete this section and substitute the following: <br />The Proposal Form identifies the project and its location and describes the Work. It <br />also lists estimated quantities, units of measurement, the items of work, and the <br />materials to be furnished at the unit bid prices. Bidder shall complete spaces on the <br />proposal form that call for, and are not limited to, unit prices; extensions; summations; <br />the total bid amount; signatures; date; and, where applicable, retail sales taxes and
The URL can be used to link to this page
Your browser does not support the video tag.