My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1105 13TH ST 2024-06-07
>
Address Records
>
13TH ST
>
1105
>
1105 13TH ST 2024-06-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 7:14:07 AM
Creation date
5/29/2024 12:43:06 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1105
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUPLINGS <br />Awg <br />FIG. 7402 <br />S1ideLCK° Ready for Installation Coupling <br />ucanv FOR INSTALLATION - RMUT OUT OF THE BOX <br />Do not dlsasemblethe SlldeLOK" Coupling. The Hgure7402 coupling Is ready for Installation. The bolt and gasket do not need to be removed. <br />la-w <br />1Pipe Preparation— Pipe ends are to 2ra GasketPrepation—Ensurethe <br />be rolled or mtgrooved according to Anvil gasket is suitable forthe intended application <br />specifications Not for use on"E6"rolled or aR by referring to the Anvil gasket compatibility <br />grooved pipe ends The pipe end must be chart Apply a light coating of Gruvlok"Xtreme" <br />smooth and free from metal burrs or projections Lubricant to exposed gasket surfaces. <br />METHOD #1 <br />Slide the SlideLOK coupling completely over the grooved pipe end. <br />This will allow a clear and un-obstructed view of the pipe for correct <br />alignment <br />0-e, <br />A. Slide the coupling on the pipe C. Slide the coupling back over the <br />True <br />pastne groove e bolts and nuts grooves so that the mupling keys <br />can be hand tightened to position are located over the respective <br />the coupling in place grooves on both pipe ends. <br />B. Align the mating pipe end. Align D. Follow the instruct ons on <br />the two adjoining pipes together fastening the coupling as shown in <br />Step 4. <br />4Final Assembly <br />The SlideLOK coupling is <br />designed to achieve pad to <br />pad (metaltometal contact) <br />using either an impact <br />wrench*or wrench. The <br />intended torque range for the <br />coupling Is located in the <br />Tablet. Securely tighten nuts <br />alternately and equally until 44 <br />the housing halves are in <br />metal -to -metal contact. <br />• CAL lION: Wfien i singan ImueRmwch wlfy that the output of the Imiect wrencfi Is <br />within the rerulred torque moge. it Is recommended that torquew encfi ow need for <br />unite axumbty In order ro obtain spadfied performance. <br />3 Assembly— The sudeLOK Figure7402 <br />maybe Installed by one of two methods. The <br />preferred method depends on the type of pipe <br />components being Joined and their orientation. <br />Please review both methods before installing. <br />METHOD #2 <br />Slide the SIideLOK"coup[ ing half way onto the pipe end or fitting. This <br />will better accommodate fitting, and valve accessories during <br />installation0 <br />A. Slide the coupling on the C. Hand hgHen the nuts to <br />fitting so that the groove and keys correctly pcvlhon the couplings <br />are aligned <br />. keys over the respective grooved <br />B. Bring the pipe end or fitting ends <br />towards the coupling and insert so D. Follow the lnstructlons on <br />that the groove and coupling keys fasten ing themupling asshownln <br />are aligned. Step4. <br />5 Final Inspection ' <br />Ensure the coupling Is <br />properly aligned in the <br />grooves and the housing <br />halves are in metal to metal <br />contact, depicted in the <br />pictures to the right <br />Sizes Torque <br />A R{65 <br />2-4 80-100 <br />5-6 100-130 <br />8 130-180 <br />
The URL can be used to link to this page
Your browser does not support the video tag.