Laserfiche WebLink
<br />Page 10 of 125 <br />ii. The Contractor jointly scopes the work with the City. <br />iii. The Contractor prepares a detailed Scope of Work. <br />iv. The City reviews the scope of work, modifies the scope as applicable, and requests a <br />price proposal from the Contractor. <br />v. The Contractor prepares a Job Order Proposal for the Project, including a Price <br />Proposal, Schedule, list of Subcontractors, sketches or drawings, and other requested <br />documentation. <br />vi. If the Job Order Proposal is found to be complete and reasonable, a Job Order may be <br />issued. <br />vii. A Job Order will reference the detailed Scope of Work and set forth the completion <br />time and price. The price will be a lump sum, a fixed price for the completion of the <br />detailed Scope of Work. <br />viii. A separate Job Order will be issued for each Project. Supplemental change orders will <br />contain extra work, credits, and deletions. <br />All Job Orders issued prior to the expiration of this Contract shall be performed and completed as part <br />of this contract. Payments will be made, and the guarantee period will continue after the contract <br />term has expired. <br />All terms and conditions of the Contract apply to each Job Order. <br />2.8 COMPLIANCE WITH APPLICABLE CODES, LAWS AND REGULATIONS <br />The Work shall be conducted by the Contractor in strict accordance with the Contract Documents and <br />all applicable Federal, State, and City laws, regulations, and codes, including but not limited to: <br />• City of Everett Standard Plans, current edition <br />• City of Everett Standard Specifications, current edition <br />• WSDOT Standard Specifications for Road, Bridge, and Municipal Construction, current edition, <br />and all amendments <br />• Manual of Uniform Traffic Control Devices (MUTCD) <br />• EPA and Washington Department of Ecology Standards <br />• Others, as required. <br />2.9 FEDERAL REGULATIONS <br />At times, the City is a recipient of federal funding. When a Job Order is funded with federal funds, the <br />City will attach any grant terms, conditions, and special requirements that will be applicable to the Job <br />Order with the Job Order Intake form. The Contractor agrees to abide by all federal terms and <br />conditions in effect for that Job Order. Current Federal Transit Administration clauses are attached as <br />references. However, the City may obtain additional federal funding from other sources. <br />