My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 89 2-01.5.OPT2.DOCX 1 (******) 2 “Tree Removal, Salvage, Stockpile, Placement, 12-Inch Diam. and Over”, per each. 3 The unit Contract price per each for “Tree Removal, Salvage, Stockpile, Placement, 12-4 Inch Diam. and Over” shall be full pay to perform the Work as specified, including tree 5 removal, cutting logs into 10 feet minimum length sections, salvage and stockpile of logs, 6 ivy removal from logs, chipping of branches, stockpiling of chipped branches, and 7 placement of logs. 8 9 2-02.GR2 10 Removal of Structures and Obstructions 11 12 2-02.3.GR2 13 Construction Requirements 14 15 2-02.3.INST1.GR2 16 Section 2-02.3 is supplemented with the following: 17 18 2-02.3.OPT1.FR2.DOCX 19 (September 7, 2021) 20 Removal of Obstructions 21 The following miscellaneous Obstructions shall be removed and disposed of: 22 23 *** 24 Station/Location Item Approximate Quantity 400+75 RT/Shore Ave Parking Wheel Stops 4 EA 14+00 – 14+58 RT / Mukilteo Blvd Extruded Curb 60 FT 14+62 – 15+56 RT / Mukilteo Blvd Extruded Curb 100 FT 302+25 LT – 16+32 LT Mukilteo Ln / Mukilteo Blvd Extruded Curb 220 FT 20+53 – 22+24 LT Mukilteo Blvd Extruded Curb 190 FT *** 25 26 2-02.3.OPT8.DOCX 27 (******) 28 Park Demolition for Staging 29 The Contractor shall remove and dispose of Edgewater Park items noted in the Plans and 30 these Specifications to utilize the area for construction staging. Park items to be salvaged 31 shall be removed, delivered, and safely stored at a location designated by the Engineer. 32 33 For Bidding purposes, removal items indicated in the Plans include, but is not limited to, 34 the approximate quantities listed in the table below as part of the lump sum item “Park 35 Demolition for Staging.” 36 37 Station/Location Item Approximate Quantity Sta 401+75 RT – Sta 403+41 RT Chain Link Fence – 4 Ft. height 160 LF Sta 400+52 RT – Sta 21+03 LT Chain Link Fence – 4 Ft. height 62 LF
The URL can be used to link to this page
Your browser does not support the video tag.