Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 89 2-01.5.OPT2.DOCX 1 (******) 2 “Tree Removal, Salvage, Stockpile, Placement, 12-Inch Diam. and Over”, per each. 3 The unit Contract price per each for “Tree Removal, Salvage, Stockpile, Placement, 12-4 Inch Diam. and Over” shall be full pay to perform the Work as specified, including tree 5 removal, cutting logs into 10 feet minimum length sections, salvage and stockpile of logs, 6 ivy removal from logs, chipping of branches, stockpiling of chipped branches, and 7 placement of logs. 8 9 2-02.GR2 10 Removal of Structures and Obstructions 11 12 2-02.3.GR2 13 Construction Requirements 14 15 2-02.3.INST1.GR2 16 Section 2-02.3 is supplemented with the following: 17 18 2-02.3.OPT1.FR2.DOCX 19 (September 7, 2021) 20 Removal of Obstructions 21 The following miscellaneous Obstructions shall be removed and disposed of: 22 23 *** 24 Station/Location Item Approximate Quantity 400+75 RT/Shore Ave Parking Wheel Stops 4 EA 14+00 – 14+58 RT / Mukilteo Blvd Extruded Curb 60 FT 14+62 – 15+56 RT / Mukilteo Blvd Extruded Curb 100 FT 302+25 LT – 16+32 LT Mukilteo Ln / Mukilteo Blvd Extruded Curb 220 FT 20+53 – 22+24 LT Mukilteo Blvd Extruded Curb 190 FT *** 25 26 2-02.3.OPT8.DOCX 27 (******) 28 Park Demolition for Staging 29 The Contractor shall remove and dispose of Edgewater Park items noted in the Plans and 30 these Specifications to utilize the area for construction staging. Park items to be salvaged 31 shall be removed, delivered, and safely stored at a location designated by the Engineer. 32 33 For Bidding purposes, removal items indicated in the Plans include, but is not limited to, 34 the approximate quantities listed in the table below as part of the lump sum item “Park 35 Demolition for Staging.” 36 37 Station/Location Item Approximate Quantity Sta 401+75 RT – Sta 403+41 RT Chain Link Fence – 4 Ft. height 160 LF Sta 400+52 RT – Sta 21+03 LT Chain Link Fence – 4 Ft. height 62 LF