My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 115 5-04.3(11)E Rejection - An Entire Sublot 1 An entire sublot that is suspected of being defective may be rejected. When a sublot is 2 rejected a minimum of two additional random samples from this sublot will be obtained. 3 These additional samples and the original sublot will be evaluated as an independent lot 4 in accordance with Section 1-06.2(2). 5 6 5-04.3(11)F Rejection - A Lot in Progress 7 The Contractor shall shut down operations and shall not resume HMA placement until 8 such time as the Engineer is satisfied that material conforming to the Specifications can 9 be produced: 10 11 1. When the Composite Pay Factor (CPF) of a lot in progress drops below 1.00 and 12 the Contractor is taking no corrective action, or 13 2. When the Pay Factor (PF) for any constituent of a lot in progress drops below 14 0.95 and the Contractor is taking no corrective action, or 15 3. When either the PFi for any constituent or the CPF of a lot in progress is less 16 than 0.75. 17 18 5-04.3(11)G Rejection - An Entire Lot (Mixture or Compaction) 19 An entire lot with a CPF of less than 0.75 will be rejected. 20 21 5-04.3(12) Joints 22 23 5-04.3(12)A HMA Joints 24 25 5-04.3(12)A1 Transverse Joints 26 The Contractor shall conduct operations such that the placing of the top or wearing 27 course is a continuous operation or as close to continuous as possible. Unscheduled 28 transverse joints will be allowed and the roller may pass over the unprotected end of the 29 freshly laid mixture only when the placement of the course must be discontinued for such 30 a length of time that the mixture will cool below compaction temperature. When the Work 31 is resumed, the previously compacted mixture shall be cut back to produce a slightly 32 beveled edge for the full thickness of the course. 33 34 A temporary wedge of HMA constructed on a 20H:1V shall be constructed where a 35 transverse joint as a result of paving or planing is open to traffic. The HMA in the 36 temporary wedge shall be separated from the permanent HMA by strips of heavy 37 wrapping paper or other methods approved by the Engineer. The wrapping paper shall 38 be removed and the joint trimmed to a slightly beveled edge for the full thickness of the 39 course prior to resumption of paving. 40 41 The material that is cut away shall be wasted and new mix shall be laid against the cut. 42 Rollers or tamping irons shall be used to seal the joint. 43 44 5-04.3(12)A2 Longitudinal Joints 45
The URL can be used to link to this page
Your browser does not support the video tag.