My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 116 The longitudinal joint in any one course shall be offset from the course immediately 1 below by not more than 6 inches nor less than 2 inches. All longitudinal joints 2 constructed in the wearing course shall be located at a lane line or an edge line of the 3 Traveled Way. A notched wedge joint shall be constructed along all longitudinal joints in 4 the wearing surface of new HMA unless otherwise approved by the Engineer. The 5 notched wedge joint shall have a vertical edge of not less than the maximum aggregate 6 size or more than ½ of the compacted lift thickness and then taper down on a slope not 7 steeper than 4H:1V. The sloped portion of the HMA notched wedge joint shall be 8 uniformly compacted. 9 10 5-04.3(12)B Bridge Paving Joint Seals 11 12 5-04.3(12)B1 HMA Sawcut and Seal 13 Prior to placing HMA on the bridge deck, establish sawcut alignment points at both ends 14 of the bridge paving joint seals to be placed at the bridge ends, and at interior joints 15 within the bridge deck when and where shown in the Plans. Establish the sawcut 16 alignment points in a manner that they remain functional for use in aligning the sawcut 17 after placing the overlay. 18 19 Submit a Type 1 Working Drawing consisting of the sealant manufacturer’s application 20 procedure. 21 22 Construct the bridge paving joint seal as specified ion the Plans and in accordance with 23 the detail shown in the Standard Plans. Construct the sawcut in accordance with the 24 detail shown in the Standard Plan. Construct the sawcut in accordance with Section 5-25 05.3(8)B and the manufacturer’s application procedure. 26 27 5-04.3(12)B2 Paved Panel Joint Seal 28 Construct the paved panel joint seal in accordance with the requirements specified in 29 section 5-04.3(12)B1 and the following requirement: 30 31 1. Clean and seal the existing joint between concrete panels in accordance with 32 Section 5-01.3(8) and the details shown in the Standard Plans. 33 34 5-04.3(13) Surface Smoothness 35 The completed surface of all courses shall be of uniform texture, smooth, uniform as to 36 crown and grade, and free from defects of all kinds. The completed surface of the 37 wearing course shall not vary more than ⅛ inch from the lower edge of a 10-foot 38 straightedge placed on the surface parallel to the centerline. The transverse slope of the 39 completed surface of the wearing course shall vary not more than ¼ inch in 10 feet from 40 the rate of transverse slope shown in the Plans. 41 42 When deviations in excess of the above tolerances are found that result from a high 43 place in the HMA, the pavement surface shall be corrected by one of the 44 following methods: 45 46
The URL can be used to link to this page
Your browser does not support the video tag.