My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 122 mixture. If the Contractor elects to remove and replace mix as allowed by Section 5-1 04.3(11), the material removed will not be measured. 2 3 Roadway cores will be measured per each for the number of cores taken. 4 5 Preparation of untreated roadway will be measured by the mile once along the centerline 6 of the main line Roadway. No additional measurement will be made for ramps, Auxiliary 7 Lanes, service roads, Frontage Roads, or Shoulders. Measurement will be to the nearest 8 0.01 mile. 9 10 Soil residual herbicide will be measured by the mile for the stated width to the nearest 11 0.01 mile or by the square yard, whichever is designated in the Proposal. 12 13 Pavement repair excavation will be measured by the square yard of surface marked prior 14 to excavation. 15 16 Asphalt for prime coat will be measured by the ton in accordance with Section 1-09.2. 17 18 Prime coat aggregate will be measured by the cubic yard, truck measure, or by the ton, 19 whichever is designated in the Proposal. 20 21 Asphalt for fog seal will be measured by the ton, as provided in Section 5-02.4. 22 23 Longitudinal joint seals between the HMA and cement concrete pavement will be 24 measured by the linear foot along the line and slope of the completed joint seal. 25 26 Planing bituminous pavement will be measured by the square yard. 27 28 Temporary pavement marking will be measured by the linear foot as provided in Section 29 8-23.4. 30 31 Water will be measured by the M gallon as provided in Section 2-07.4. 32 33 5-04.5 Payment 34 Payment will be made for each of the following Bid items that are included in the 35 Proposal: 36 37 “HMA Cl. ___ PG ___”, per ton. 38 39 “HMA for Approach Cl. ___ PG ___”, per ton. 40 41 “HMA for Preleveling Cl. ___ PG ___”, per ton. 42 43 “HMA for Pavement Repair Cl. ___ PG ___”, per ton. 44
The URL can be used to link to this page
Your browser does not support the video tag.