My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 3 1 Supplement this Section with the following: 2 3 All references in the Standard Specifications or WSDOT General Special Provisions, to 4 the terms “Department of Transportation”, “Washington State Transportation 5 Commission”, “Commission”, “Secretary of Transportation”, “Secretary”, “Headquarters”, 6 and “State Treasurer” shall be revised to read “Contracting Agency”. 7 8 All references to the terms “State” or “state” shall be revised to read “Contracting 9 Agency” unless the reference is to an administrative agency of the State of Washington, 10 a State statute or regulation, or the context reasonably indicates otherwise. 11 12 All references to “State Materials Laboratory” shall be revised to read “Contracting 13 Agency designated location”. 14 15 All references to “final contract voucher certification” shall be interpreted to mean the 16 Contracting Agency form(s) by which final payment is authorized, and final completion 17 and acceptance granted. 18 19 Additive 20 A supplemental unit of work or group of bid items, identified separately in the Bid 21 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition 22 to the base bid. 23 24 Alternate 25 One of two or more units of work or groups of bid items, identified separately in the Bid 26 Proposal, from which the Contracting Agency may make a choice between different 27 methods or material of construction for performing the same work. 28 29 Business Day 30 A business day is any day from Monday through Friday except holidays as listed in 31 Section 1-08.5. 32 33 Contract Bond 34 The definition in the Standard Specifications for “Contract Bond” applies to whatever 35 bond form(s) are required by the Contract Documents, which may be a combination of a 36 Payment Bond and a Performance Bond. 37 38 Contract Documents 39 See definition for “Contract”. 40 41 Contract Time 42 The period of time established by the terms and conditions of the Contract within which 43 the Work must be physically completed. 44 45 Notice of Award 46 The written notice from the Contracting Agency to the successful Bidder signifying the 47 Contracting Agency’s acceptance of the Bid Proposal. 48 49
The URL can be used to link to this page
Your browser does not support the video tag.