Edgewater Creek Bridge Replacement November 2023 4 Notice to Proceed 1 The written notice from the Contracting Agency or Engineer to the Contractor authorizing 2 and directing the Contractor to proceed with the Work and establishing the date on which 3 the Contract time begins. 4 5 Traffic 6 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and 7 equestrian traffic. 8 9 1-02.1.RTF 10 1-02 BID PROCEDURES AND CONDITIONS 11 12 1-02.1 Prequalification of Bidders 13 14 Delete this section and replace it with the following: 15 16 1-02.1 Qualifications of Bidder 17 (January 24, 2011 APWA GSP) 18 19 Before award of a public works contract, a bidder must meet at least the minimum 20 qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to 21 be awarded a public works project. 22 23 COE 1-02.2.DOCX 24 1-02.2 Plans and Specifications 25 (June 27, 2011 APWA GSP) 26 27 Delete this section and replace it with the following: 28 29 Information as to where Bid Documents can be obtained or reviewed can be found in the 30 Call for Bids (Advertisement for Bids) for the work. 31 32 After award of the contract, plans and specifications will be issued to the Contractor at no 33 cost as detailed below: 34 35 To Prime Contractor No. of Sets Basis of Distribution Reduced plans (11" x 17") 8 Furnished automatically upon award. Contract Provisions 8 Furnished automatically upon award. Large plans (e.g., 22" x 34") 4 Furnished only upon request. 36 Additional plans and Contract Provisions may be obtained by the Contractor from the 37 source stated in the Call for Bids, at the Contractor’s own expense. 38 39