My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 132 DIVISION6.GR6 1 Division 6 2 Structures 3 4 6-01.GR6 5 General Requirements for Structures 6 7 6-01.5.GR6 8 Work Access and Temporary Structures 9 10 6-01.5.INST1.GR6 11 Section 6-01.5 is re-titled and revised to read: 12 13 6-01.5.OPT1.FB6.DOCX 14 (April 1, 2019) 15 Work Access 16 The Contractor shall construct work access to accommodate all work within the wetted 17 perimeter, or vertically above the sensitive area, of *** Edgewater Creek and adjacent 18 wetlands ***, as shown in the plans or staked by the Engineer. The Contractor shall 19 construct and remove the work access in accordance with all environmental regulations 20 and permits, including those specified in Sections 1-07.5 and 1-07.6. 21 22 Submittals 23 The Contractor shall submit Type 2 Working Drawings of the work access, except 24 that if the Contractor chooses an access alternative using a work trestle structure, 25 the Working Drawings shall be Type 2E. The Contractor shall design the work access 26 structure to withstand all applicable loads in accordance with accepted design codes. 27 The Contractor shall specify the design code(s) in the design calculations and 28 working drawings. 29 30 The Contractor shall include information with the work access submittal on the 31 construction equipment that will use the work access. The Contractor shall specify 32 the type and model of construction equipment to be used, and shall include 33 equipment catalogue cuts with capacities and geometry. The Contractor shall include 34 anticipated wheel or track loads, axle spacings, outrigger geometry and reactions, 35 crane pick angles and reach, and other equipment details. 36 37 6-01.5.OPT1(B).GB6 38 (April 6, 2015) 39 Payment 40 Payment will be made in accordance with Section 1-09.3 for the following bid item: 41 42 "Work Access - ___”, lump sum. 43 44 6-02.GR6 45 Concrete Structures 46 47 6-02.2.GR6 48 Materials 49 50
The URL can be used to link to this page
Your browser does not support the video tag.