Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 142 accepted changes will be made in the lump sum Contract price for *** “Superstructure - 1 _____” *** even though the actual quantities required may deviate from those listed. 2 3 6-02.4.OPT1.DOCX 4 (******) 5 Seismic isolation bearings shall be measured per each for each bearing assembly 6 furnished and installed. 7 8 6-02.5.GR6 9 Payment 10 11 6-02.5.INST1.DOCX 12 The fourth paragraph of Section 6-02.5 is supplemented with the following: 13 14 6-02.5.OPT2.DOCX 15 (******) 16 All costs in connection with furnishing and applying anti-graffiti coating to concrete 17 surfaces as specified, shall be included in the unit contract price per cubic yard for “Conc. 18 Class ____”. If the concrete is to be paid for other than by class of concrete, then the 19 costs shall be included in the associated item of work. 20 21 6-02.5.INST3.GR6 22 The fifth and sixth bid items under Section 6-02.5 are supplemented with the following: 23 24 6-02.5.OPT20.GB6 25 (April 6, 2015) 26 The contract quantity specified for “Steel Reinf. Bar for Bridge” includes the quantity for 27 the epoxy-coated steel reinforcing bars located in the substructure of the bridge(s) 28 included in this project. 29 30 6-02.5.OPT91.FB6.DOCX 31 (June 26, 2000) 32 Bridge and Structures Minor Items 33 For the purpose of payment, such bridge and structures items as *** premolded joint filler, 34 and foam between approach slab and retaining wall, *** etc., for which there is no pay 35 item included in the proposal, are considered as bridge and structures minor items. All 36 costs in connection with furnishing and installing these bridge and structures minor items 37 as shown and noted in the Plans and as outlined in these specifications and in the 38 Standard Specifications shall be included in the *** “Superstructure - _____” lump sum 39 cost. *** 40 41 6-02.5.OPT92.FB6.DOCX 42 (June 26, 2000) 43 Bridge Supported Utilities 44 All costs in connection with placing *** conduits for PUD *** through the superstructure of 45 *** EVTB15 Edgewater Bridge *** as shown in the Plans, including all *** materials and 46 painting of galvanized coating ***, shall be included in the *** “Superstructure - _____” 47 lump sum cost. *** 48 49