Edgewater Creek Bridge Replacement November 2023 143 6-02.5.OPT1.DOCX 1 (******) 2 “Seismic Isolation Bearing” per each. 3 The unit Contract price per each for “Seismic Isolation Bearing” shall be full pay for 4 performing the Work as specified in Section 6-02.3(19), including design, testing, and 5 inspection. 6 7 6-06.GR6 8 Bridge Railings 9 10 6-06.INST1.DOCX 11 Section 6-06 is supplemented with the following: 12 13 6-06.SA1.DOCX 14 (******) 15 Description 16 This Work consists of constructing the bridge railing including the precast pillars and moment 17 slab at Retaining Wall 1 in accordance with the Plans. 18 19 Materials 20 Materials shall meet the requirements specified on the Plans. 21 22 Construction Requirements 23 Construction shall meet the requirements specified on the Plans. 24 25 Measurement 26 No specific unit of measure will apply to the lump sum item for the bridge railing. 27 28 Payment 29 Payment will be made for the following bid item when included in the proposal: 30 31 “Bridge Railing”, lump sum. 32 The lump sum Contract price for “Bridge Railing” shall be full compensation for all costs 33 incurred by the Contractor in completing the work in constructing the bridge railing and precast 34 pillars in accordance with the Plans. 35 36 6-07.GR6 37 Painting 38 39 6-07.3.GR6 40 Construction Requirements 41 42 6-07.3.INST1.DOCX 43 Section 6-07.3 is supplemented with the following: 44 45