My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 144 6-07.3.OPT1.DOCX 1 (******) 2 Powder Coating of Aluminum Surfaces 3 The surfaces of the aluminum tube rail of the bridge railing and the aluminum luminaire 4 poles shall receive powder coating in accordance with Section 6-07.3(11)B. 5 6 The color of the finish coat, when dry, shall have an anodized bronze finish. The color 7 shall be approved by the Engineer prior to manufacturing. 8 9 6-07.5.DOCX 10 Payment 11 12 6-07.5.INST1.DOCX 13 Section 6-07.5 is supplemented with the following: 14 15 6-07.5.OPT1.DOCX 16 (******) 17 Payment for powder coating of aluminum surfaces will be in considered incidental to the 18 work associated with furnishing and constructing the aluminum bridge railing and 19 aluminum luminaire poles. 20 21 6-16.GR6 22 Soldier Pile and Soldier Pile Tieback Walls 23 24 6-16.5.DOCX 25 Payment 26 27 6-16.5.INST1.DOCX 28 Section 6-16.5 is supplemented with the following: 29 30 6-16.5.OPT1.DOCX 31 (******) 32 Payment for furnishing and installing the top mount cable fence will be considered 33 incidental to the unit Contract price for “Furnishing Soldier Pile”. 34 35 6-19.GR6 36 Shafts 37 38 6-19.3.GR6 39 Construction Requirements 40 41 6-19.3(6).GR6 42 Contractor Furnished Accessories for Nondestructive QA Testing 43 44 6-19.3(6)E.GR6 45 Thermal Wire and Thermal Access Points (TAPs) 46 47
The URL can be used to link to this page
Your browser does not support the video tag.