Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 144 6-07.3.OPT1.DOCX 1 (******) 2 Powder Coating of Aluminum Surfaces 3 The surfaces of the aluminum tube rail of the bridge railing and the aluminum luminaire 4 poles shall receive powder coating in accordance with Section 6-07.3(11)B. 5 6 The color of the finish coat, when dry, shall have an anodized bronze finish. The color 7 shall be approved by the Engineer prior to manufacturing. 8 9 6-07.5.DOCX 10 Payment 11 12 6-07.5.INST1.DOCX 13 Section 6-07.5 is supplemented with the following: 14 15 6-07.5.OPT1.DOCX 16 (******) 17 Payment for powder coating of aluminum surfaces will be in considered incidental to the 18 work associated with furnishing and constructing the aluminum bridge railing and 19 aluminum luminaire poles. 20 21 6-16.GR6 22 Soldier Pile and Soldier Pile Tieback Walls 23 24 6-16.5.DOCX 25 Payment 26 27 6-16.5.INST1.DOCX 28 Section 6-16.5 is supplemented with the following: 29 30 6-16.5.OPT1.DOCX 31 (******) 32 Payment for furnishing and installing the top mount cable fence will be considered 33 incidental to the unit Contract price for “Furnishing Soldier Pile”. 34 35 6-19.GR6 36 Shafts 37 38 6-19.3.GR6 39 Construction Requirements 40 41 6-19.3(6).GR6 42 Contractor Furnished Accessories for Nondestructive QA Testing 43 44 6-19.3(6)E.GR6 45 Thermal Wire and Thermal Access Points (TAPs) 46 47