My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 145 6-19.3(6)E.INST1.GR6 1 Section 6-19.3(6)E is supplemented with the following: 2 3 6-19.3(6)E.OPT1.GB6 4 (January 2, 2018) 5 The thermal wire and associated couplers shall be obtained from the following 6 source: 7 8 Pile Dynamics, Inc. 9 30724 Aurora Road 10 Cleveland, OH 44139 11 (216) 831-6131 12 FAX: (216) 831-0916 13 www.pile.com 14 15 6-19.5.GR6 16 Payment 17 18 6-19.5.INST2.DOCX 19 The following is added after the second line of Section 6-19.5: 20 21 6-19.5.OPT3.DOCX 22 (******) 23 “Constructing 6.5 ft. Diam Shaft”, per linear foot. 24 25
The URL can be used to link to this page
Your browser does not support the video tag.