Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 146 DIVISION7.GR7 1 Division 7 2 Drainage Structures, Storm Sewers, Sanitary 3 Sewers, Water Mains, and Conduits 4 5 7-01.DOCX 6 Drains 7 8 7-01.1.DOCX 9 Description 10 11 7-01.1.INST1.DOCX 12 Section 7-01.1 is supplemented with the following: 13 14 7-01.1.OPT1.DOCX 15 (******) 16 This Work consists of furnishing and installing heavy duty bridge scuppers, in accordance 17 with the Plans and these Specifications, at the locations as staked. 18 19 7-01.2.DOCX 20 Materials 21 22 7-01.2.INST1.DOCX 23 Section 7-01.2 is supplemented with the following: 24 25 7-01.2.OPT1.DOCX 26 (******) 27 Heavy duty bridge scuppers shall be East Jordan 5800Z Heavy Duty Bridge Scuppers 28 with 5800M1 grate manufactured by East Jordan: 29 30 East Jordan 31 13127 State Ave 32 Marysville, WA 98271 33 tel 360-651-6144 34 EJCO.com 35 36 Component parts shall fit together in a satisfactory manner acceptable to the Engineer. 37 Connection to drainage system will be completed with an 8 In. pipe coupler. 38 39 7-01.3.DOCX 40 Construction Requirements 41 42 7-01.3.INST1.DOCX 43 Section 7-01.3 is supplemented with the following: 44 45