My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 147 7-01.3.OPT1.DOCX 1 (******) 2 Heavy duty bridge scupper shall be furnished and installed in accordance with the 3 manufacturer’s Specifications and the details shown in the Plans. 4 5 7-01.4.DOCX 6 Measurement 7 8 7-01.4.INST1.DOCX 9 Section 7-01.4 is supplemented with the following: 10 11 7-01.4.OPT1.DOCX 12 (******) 13 Heavy duty bridge scupper will be measured per each. 14 15 7-01.5.DOCX 16 Payment 17 18 7-01.5.INST1.DOCX 19 Section 7-01.5 is supplemented with the following: 20 21 7-01.5.OPT1.DOCX 22 (******) 23 “Heavy Duty Bridge Scupper”, per each. 24 The unit contract price for “Heavy Duty Bridge Scupper” shall be full pay for all labor, tools, 25 equipment, and materials necessary to complete the work as specified, including bridge 26 scupper, pipe coupler, connection to drainage system with pipe coupler, cleaning, and 27 testing. 28 29 7-04.DOCX 30 Storm Sewers 31 32 7-04.1.DOCX 33 Description 34 35 7-04.1.INST1.DOCX 36 Section 7-04.1 is supplemented with the following: 37 38 7-04.1.OPT1.DOCX 39 (******) 40 This Work consists of constructing pipe anchors and deadman anchors in accordance 41 with the Plans and these Specifications as staked. 42 43 This Work shall consist of furnishing, installing, and providing all labor, materials and 44 equipment necessary to replace existing High Density Polyethylene (HDPE) Pipe with 45 new HDPE Pipe. The Work shall be accomplished in accordance with the Standard 46 Specifications and as shown in the Plans. 47
The URL can be used to link to this page
Your browser does not support the video tag.