Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 147 7-01.3.OPT1.DOCX 1 (******) 2 Heavy duty bridge scupper shall be furnished and installed in accordance with the 3 manufacturer’s Specifications and the details shown in the Plans. 4 5 7-01.4.DOCX 6 Measurement 7 8 7-01.4.INST1.DOCX 9 Section 7-01.4 is supplemented with the following: 10 11 7-01.4.OPT1.DOCX 12 (******) 13 Heavy duty bridge scupper will be measured per each. 14 15 7-01.5.DOCX 16 Payment 17 18 7-01.5.INST1.DOCX 19 Section 7-01.5 is supplemented with the following: 20 21 7-01.5.OPT1.DOCX 22 (******) 23 “Heavy Duty Bridge Scupper”, per each. 24 The unit contract price for “Heavy Duty Bridge Scupper” shall be full pay for all labor, tools, 25 equipment, and materials necessary to complete the work as specified, including bridge 26 scupper, pipe coupler, connection to drainage system with pipe coupler, cleaning, and 27 testing. 28 29 7-04.DOCX 30 Storm Sewers 31 32 7-04.1.DOCX 33 Description 34 35 7-04.1.INST1.DOCX 36 Section 7-04.1 is supplemented with the following: 37 38 7-04.1.OPT1.DOCX 39 (******) 40 This Work consists of constructing pipe anchors and deadman anchors in accordance 41 with the Plans and these Specifications as staked. 42 43 This Work shall consist of furnishing, installing, and providing all labor, materials and 44 equipment necessary to replace existing High Density Polyethylene (HDPE) Pipe with 45 new HDPE Pipe. The Work shall be accomplished in accordance with the Standard 46 Specifications and as shown in the Plans. 47