My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 148 1 7-04.2.DOCX 2 Materials 3 4 7-04.2.INST1.DOCX 5 Section 7-04.2 is supplemented with the following: 6 7 7-04.2.OPT1.DOCX 8 (******) 9 Pipe anchor and deadman anchor materials shall be in accordance with the details shown 10 in the Plans. All parts shall be galvanized or stainless steel unless otherwise noted. Manta 11 Ray mechanical soil anchors shall be model MR-88, 6-foot minimum length. 12 13 The pipe used for new high density polyethylene (HDPE) shall meet the requirements of 14 Section 9-05.23. 15 16 7-04.3.DOCX 17 Construction Requirements 18 19 7-04.3.INST1.DOCX 20 Section 7-04.3 is supplemented with the following: 21 22 7-04.3.OPT1.DOCX 23 (******) 24 Pipe anchors and deadman anchors shall be furnished and installed in accordance with 25 the details shown in the Plans. 26 27 Pipe Anchor Type A 28 Earth anchoring system using Manta Ray mechanical soil anchors on pipe placed on 29 slope, with limits as shown in the Plans. The Manta Ray mechanical soil anchors shall be 30 installed according to the manufacturer’s instructions. Pre-drilling may be required. 31 32 Pipe Anchor Type B 33 Earth anchoring system using pipe stakes on pipe placed on surface mounted pipe, with 34 limits as shown in the Plans. 35 36 HDPE Installation 37 Section 7-04.3(2) is added as follows: 38 39 7-04.3(2)A Submittals 40 The Contractor shall submit the following to the Engineer for review and approval 41 five (5) working days in advance of the pre-construction conference, as specified in 42 Section 1-08.0(1) of the Special Provisions: 43 44 1. A detailed written narrative of the pipe construction procedure and 45 sequence. 46 2. List of equipment/machinery used. 47 3. Bypass pumping plan. 48 4. The pipe fusion equipment operator/technician’s experience and verifiable 49 references. 50
The URL can be used to link to this page
Your browser does not support the video tag.