Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 153 1 7-05.5.OPT1.DOCX 2 (******) 3 “Catch Basin Type 2 ____ In. Diam. Flow Control Structure”, per each. 4 The payment for “Catch Basin Type ___”, “Catch Basin Type 2 _ In. Diam.” and “catch 5 Basin Type 2 ____ In. Diam. Flow Control Structure” per each shall include full 6 compensation for furnishing and constructing Catch Basins complete and connected to 7 the storm drain including saw cutting; removal, hauling and disposing of pavement; 8 bedding and backfill materials; compaction; seals; frames and grates; dewatering, 9 stockpiling suitable excavated materials for use as backfill as directed by the Engineer, 10 compacting and crushed surfacing, and base course bedding. 11 12 The unit Contract price per each for “Connection to Drainage Structure” shall include 13 furnishing and installing pipe couplers. 14 15 7-12.DOCX 16 Valves for Water Mains 17 18 7-12.1.DOCX 19 Description 20 21 7-12.1.INST1.DOCX 22 Section 7-12.1 is supplemented with the following: 23 24 7-12.1.OPT1.DOCX 25 (******) 26 This Work consists of adjusting existing valve boxes and covers to grade as shown in the 27 Plans as designated by the Engineer. 28 29 7-12.2.DOCX 30 Materials 31 32 7-12.2.INST1.DOCX 33 Section 7-12.2 is supplemented with the following: 34 35 7-12.2.OPT1.DOCX 36 (******) 37 Riser rings shall be cast iron. 38 39 7-12.3.DOCX 40 Construction Requirements 41 42 7-12.3.INST1.DOCX 43 Section 7-12.3 is supplemented with the following: 44 45