Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 154 7-12.3.OPT1.DOCX 1 (******) 2 Adjust Water Valve Box 3 The Contractor shall have the option of adjusting the valve box to grade by the use of 4 riser rings or by removing and resetting the valve box and cover to finished grade. 5 Removal and resetting operations shall be conducted to prevent damage to the valve, 6 valve box and cover. All parts or materials damaged as a result of the Contractor’s 7 operations shall be replaced at no expense to the Contracting Agency. 8 9 If the valve box is removed and reset, the patch material used around the valve box shall 10 be the same as the adjacent pavement. For asphalt concrete pavement Roadways, valve 11 boxes located in the Traveled Way shall be adjusted to final grade after final paving in 12 accordance with Section 5-04.3(13). 13 14 7-12.4.DOCX 15 Measurement 16 17 7-12.4.INST1.DOCX 18 Section 7-12.4 is supplemented with the following: 19 20 7-12.4.OPT1.DOCX 21 (******) 22 Adjusting water valve boxes will be measured per each for each valve box adjusted to 23 finished grade. 24 25 7-12.5.DOCX 26 Payment 27 28 7-12.5.INST1.DOCX 29 Section 7-12.5 is supplemented with the following: 30 31 7-12.5.OPT1.DOCX 32 (******) 33 “Adjust Water Valve Box to Finished Grade”, per each. 34 The unit Contract price per each for “Adjust Water Valve Box to Finished Grade” shall be 35 full pay for all Work associated with the adjustment, including furnishing and installing the 36 riser ring(s) and backfilling. 37 38 7.INST1.DOCX 39 Division 7 is supplemented with the following: 40 41 7.SA1.DOCX 42 (******) 43 DETENTION PIPE 44 45
The URL can be used to link to this page
Your browser does not support the video tag.