My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 6 Bid Item Breakdown Form and the DBE Trucking Credit Form are included in Section 1-1 02.9. 2 3 1-02.6.OptionB.RTF 4 1-02.6 Preparation of Proposal 5 (December 10, 2020 APWA GSP, Option B) 6 7 Supplement the second paragraph with the following: 8 4. If a minimum bid amount has been established for any item, the unit or lump sum 9 price must equal or exceed the minimum amount stated. 10 5. Any correction to a bid made by interlineation, alteration, or erasure, shall be 11 initialed by the signer of the bid. 12 13 Delete the last two paragraphs, and replace them with the following: 14 15 The Bidder shall submit with their Bid a completed Contractor Certification Wage Law 16 Compliance form, provided by the Contracting Agency. Failure to return this certification 17 as part of the Bid Proposal package will make this Bid Nonresponsive and ineligible for 18 Award. A Contractor Certification of Wage Law Compliance form is included in the 19 Proposal Forms. 20 21 The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. 22 23 A bid by a corporation shall be executed in the corporate name, by the president or a 24 vice president (or other corporate officer accompanied by evidence of authority to sign). 25 26 A bid by a partnership shall be executed in the partnership name, and signed by a 27 partner. A copy of the partnership agreement shall be submitted with the Bid Form if any 28 UDBE requirements are to be satisfied through such an agreement. 29 30 A bid by a joint venture shall be executed in the joint venture name and signed by a 31 member of the joint venture. A copy of the joint venture agreement shall be submitted 32 with the Bid Form if any UDBE requirements are to be satisfied through such an 33 agreement. 34 35 1-02.6(1).RTF 36 Add the following new section: 37 38 1-02.6(1) Recycled Materials Proposal 39 (January 4, 2016 APWA GSP) 40 41 The Bidder shall submit with the Bid, its proposal for incorporating recycled materials into 42 the project, using the form provided in the Contract Provisions. 43 44 1-02.9.OptionB.RTF.DOCX 45 1-02.9 Delivery of Proposal 46 (January 19, 2022 APWA GSP Option B) 47 48 Delete this section and replace it with the following: 49 50
The URL can be used to link to this page
Your browser does not support the video tag.