Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 6 Bid Item Breakdown Form and the DBE Trucking Credit Form are included in Section 1-1 02.9. 2 3 1-02.6.OptionB.RTF 4 1-02.6 Preparation of Proposal 5 (December 10, 2020 APWA GSP, Option B) 6 7 Supplement the second paragraph with the following: 8 4. If a minimum bid amount has been established for any item, the unit or lump sum 9 price must equal or exceed the minimum amount stated. 10 5. Any correction to a bid made by interlineation, alteration, or erasure, shall be 11 initialed by the signer of the bid. 12 13 Delete the last two paragraphs, and replace them with the following: 14 15 The Bidder shall submit with their Bid a completed Contractor Certification Wage Law 16 Compliance form, provided by the Contracting Agency. Failure to return this certification 17 as part of the Bid Proposal package will make this Bid Nonresponsive and ineligible for 18 Award. A Contractor Certification of Wage Law Compliance form is included in the 19 Proposal Forms. 20 21 The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. 22 23 A bid by a corporation shall be executed in the corporate name, by the president or a 24 vice president (or other corporate officer accompanied by evidence of authority to sign). 25 26 A bid by a partnership shall be executed in the partnership name, and signed by a 27 partner. A copy of the partnership agreement shall be submitted with the Bid Form if any 28 UDBE requirements are to be satisfied through such an agreement. 29 30 A bid by a joint venture shall be executed in the joint venture name and signed by a 31 member of the joint venture. A copy of the joint venture agreement shall be submitted 32 with the Bid Form if any UDBE requirements are to be satisfied through such an 33 agreement. 34 35 1-02.6(1).RTF 36 Add the following new section: 37 38 1-02.6(1) Recycled Materials Proposal 39 (January 4, 2016 APWA GSP) 40 41 The Bidder shall submit with the Bid, its proposal for incorporating recycled materials into 42 the project, using the form provided in the Contract Provisions. 43 44 1-02.9.OptionB.RTF.DOCX 45 1-02.9 Delivery of Proposal 46 (January 19, 2022 APWA GSP Option B) 47 48 Delete this section and replace it with the following: 49 50