Laserfiche WebLink
Edgewater Creek Bridge Replacement November 2023 168 1 8-13.4 Measurement 2 Adjust monument case and cover will be measured per each, for each monument case and 3 cover adjusted to finished grade. 4 5 Payment 6 Payment will be made for the following bid item when included in the proposal: 7 8 " Adjust Monument Case and Cover”, per each. 9 10 The unit Contract price per each for “Adjust Monument Case and Cover” shall be full pay for 11 all costs necessary to make the lowering and raising adjustments, including but not limited to 12 asphalt used to fill the resultant void created by the lowering adjustment, removal and disposal 13 of asphalt paved over the lowered monument case and cover, and the pavement sealant, 14 asphalt, concrete, and crushed surfacing used for surface restoration around the adjusted 15 monument case and cover. 16 17 8-14.GR8 18 Cement Concrete Sidewalks 19 20 8-14.1.GR8 21 Description 22 23 8-14.1.INST2.DOCX 24 Section 8-14.1 is replaced with the following: 25 26 8-14.1.OPT2.DOCX 27 (******) 28 This Work consists of constructing cement concrete transition ramps in accordance with 29 details shown in the Plans, these Specifications, the Proposed Accessibility Guidelines 30 for Pedestrian Facilities in the Public Right-of-Way, July 26, 2011 (the 2011 PROWAG)., 31 and in conformity to lines and grades shown in the Plans or as established by the 32 Engineer. 33 34 8-14.2.DOCX 35 Materials 36 37 8-14.2.INST1.DOCX 38 Section 8-14.2 is supplemented with the following: 39 40 8-14.2.OPT1.DOCX 41 (******) 42 All materials incorporated into the cement concrete transition ramp, and not mentioned 43 above, shall meet the requirements of the various applicable sections of these 44 Specifications. 45 46 8-14.3.GR8 47 Construction Requirements 48 49