My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 22 The Record Drawing markups shall document all changes in the Work, both concealed 1 and visible. Items that must be shown on the markups include but are not limited to: 2 3 • Actual dimensions, arrangement, and materials used when different than shown in 4 the Plans. 5 • Changes made by Change Order or Field Order. 6 • Changes made by the Contractor. 7 • Accurate locations of storm sewer, sanitary sewer, water mains and other water 8 appurtenances, structures, conduits, light standards, vaults, width of roadways, 9 sidewalks, landscaping areas, building footprints, channelization and pavement 10 markings, etc. Include pipe invert elevations, top of castings (manholes, inlets, 11 etc.). 12 13 If the Contract calls for the Contracting Agency to do all surveying and staking, the 14 Contracting Agency will provide the elevations at the tolerances the Contracting Agency 15 requires for the Record Drawings. 16 17 When the Contract calls for the Contractor to do the surveying/staking, the applicable 18 tolerance limits include, but are not limited to the following: 19 Vertical Horizontal As-built sanitary & storm invert and grate elevations ± 0.01 foot ± 0.01 foot As-built monumentation ± 0.001 foot ± 0.001 foot As-built waterlines, inverts, valves, hydrants ± 0.10 foot ± 0.10 foot As-built ponds/swales/water features ± 0.10 foot ± 0.10 foot As-built buildings (fin. Floor elev.) ± 0.01 foot ± 0.10 foot As-built gas lines, power, TV, Tel, Com ± 0.10 foot ± 0.10 foot As-built signs, signals, etc. N/A ± 0.10 foot 20 Making Entries on the Record Drawings: 21 22 • Use erasable colored pencil (not ink) for all markings on the Record Drawings, 23 conforming to the following color code: 24 • Additions - Red 25 • Deletions - Green 26 • Comments - Blue 27 • Dimensions - Graphite 28 • Provide the applicable reference for all entries, such as the change order number, 29 the request for information (RFI) number, or the approved shop drawing number. 30 • Date all entries. 31 • Clearly identify all items in the entry with notes similar to those in the Contract 32 Drawings (such as pipe symbols, centerline elevations, materials, pipe joint 33 abbreviations, etc.). 34 35 The Contractor shall certify on the Record Drawings that said drawings are an accurate 36 depiction of built conditions, and in conformance with the requirements detailed above. 37 The Contractor shall submit final Record Drawings to the Contracting Agency. 38