My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 73 It shall be the Contractor’s responsibility to obtain the dates and times of all 1 events. 2 3 Traffic Delays 4 When Automated Flagger Assistance Devices (AFADs) or flaggers are used to 5 control traffic, traffic shall not be stopped for more than *** 5 *** minutes at any time. 6 All traffic congestion shall be allowed to clear before traffic is delayed again. 7 8 If the delay becomes greater than *** 5 *** minutes, the Contractor shall immediately 9 begin to take action to cease the operations that are causing the delays. If the *** 5 10 *** minute delay limit has been exceeded, as determined by the Engineer, the 11 Contractor shall provide to the Engineer, a written proposal to revise his work 12 operations to meet the *** 5 *** minute limit. This proposal shall be accepted by the 13 Engineer prior to resuming any work requiring traffic control. 14 15 There shall be no delay to medical, fire, or other emergency vehicles. The Contractor 16 shall alert all flaggers and personnel of this requirement. 17 18 General Restrictions 19 Construction vehicles using a closed traffic lane shall travel only in the normal 20 direction of traffic flow unless expressly allowed in an accepted traffic control plan. 21 Construction vehicles shall be equipped with flashing or rotating amber lights. 22 23 No two consecutive on-ramps, off-ramps, or intersections shall be closed at the same 24 time and only one ramp at an interchange shall be closed, unless specifically shown 25 in the Plans. 26 27 Roads or ramps that are designated as part of a detour shall not be closed or 28 restricted during the implementation of that detour, unless specifically shown in the 29 Plans. 30 31 Controlled Access 32 No special access or egress shall be allowed by the Contractor other than normal 33 legal movements or as shown in the Plans. 34 35 Contractor’s vehicles of 10,000 GVW or greater shall not exit or enter a lane open to 36 public traffic except as follows: 37 38 Egress and ingress shall only occur during the hours of allowable lane closures, 39 and: 40 41 1. For exiting an open lane of traffic, by decelerating in a lane that is 42 closed during the allowable hours for lane closures. 43 44 2. For entering an open lane of traffic, by accelerating in a closed lane 45 during the allowable hours for lane closures. 46 47 Traffic control vehicles are excluded from the gross vehicle weight requirement. If 48 placing construction signs will restrict traveled lanes, then the work will be permitted 49 during the hours of allowable lane closures. 50 51