Laserfiche WebLink
Bid Item 6 - DEMOLITION <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid price for this bid item shall be full compensation for all costs associated with <br />furnishing the tools, labor, equipment, and materials necessary or incidental with removal and <br />disposal of the following: <br />a. Asphalt <br />b. All other various existing improvements, structure foundations, structures, fences, curb and <br />gutter, pipes, bollards, valves, manholes, catch basins, and various other items. as indicated <br />on the Drawings. Abandonment where required is considered incidental to the Project. <br />c. All site cleanup and demolition not included in Bid Item 5. <br />Partial payment shall be calculated based on the ratio of work completed as listed in the Schedule <br />of Values. <br />Bid Item 7 - YARD PIPING AND FITTINGS <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid price for this bid item shall be full compensation for all costs associated with <br />furnishing the tools, labor, equipment, and materials necessary or incidental for the following: <br />a. Excavation, haul, imported backfill, CDF, pipe bedding, and trench dewatering. <br />b. Steel and ductile iron pipe, fittings, welding, double ball expansion fittings and restrained <br />joints. Includes all pipe below the reservoir and all pipe connections. <br />c. Ring and foundation drain piping. <br />d. Valves, valve boxes, and other detailed items. <br />e. Furnishing and placing of detectable marking tape or tracer wire. <br />f. Installation of pipe anchors and pipe cutoff walls. <br />g. Temporary and permanent thrust blocking and dead man blocks, and temporary and <br />permanent restraint systems. <br />h. Ethafoam pads or sand backfill between this pipe and any existing watermains or other <br />utilities encountered. <br />i. Maintenance, restoration and/or relocation, if required, of existing water mains, electrical <br />systems, and dechlorination systems, chlorine monitoring, sump pumps, other pumping <br />systems, culverts, storm drainage pipe, other utilities and structures affected by construction <br />that are to remain. <br />j. Abandonment of existing pipes where indicated on the Drawings, including cutting, draining <br />and proper disposal, and plugging of abandoned pipe at each end with a minimum of 2-feet <br />of commercial concrete or CDF. <br />k. CCTV inspections, flushing, cleaning, bacteriological testing, and disinfection of the pipes. <br />I. Hydrant assemblies <br />m. Air release/air and/or vacuum valve assemblies including valve box or chamber and marker <br />post. <br />n. Corrosion Protection System including welding, wiring, anodes, and coatings, <br />o. CCTV inspection, cleaning, and flushing of the City sewer facilities. Additional cleaning and <br />inspections required will be at the Contractor's expense. <br />p. Decommissioning of all dewatering and monitoring wells. This item includes coordination with <br />Ecology and submittal of paperwork required for decommissioning. <br />q. Dechlorination system vaults and drainage piping. <br />Excludes work listed in the AWWD Pipe Support bid item and the Stormwater Detention Vaults and <br />Stormwater Improvements bid items. <br />Partial payment shall be calculated based on the ratio of work completed as listed in the Schedule <br />of Values. <br />Bid Item 8 - INLET/OUTLET FLOWMETER VAULT <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid price for this bid item shall be full compensation for all costs associated with <br />furnishing the tools, labor, equipment, and materials necessary or incidental for the following: <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 22 00 <br />MEASUREMENT AND PAYMENT March 2024 <br />