IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
a. Vault, pipe penetrations, pipes and conduit, ladders, chlorination system pumps, platforms, <br />handrailing, lids or hatches, testing, and protection of the structure. <br />b. Coordination with chlorine analyzer taps and piping. <br />c. Flow meters and appurtenances <br />Partial payment shall be calculated based on the ratio of work completed as listed in the Schedule <br />of Values. <br />Bid Item 9 - AWWD PS 2 FLOWMETER STRUCTURE <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid price for this bid item shall be full compensation for all costs associated with <br />furnishing the tools, labor, equipment, and materials necessary or incidental for the following: <br />a. Vault, pipe penetrations, ladders, lids or hatches, testing, and protection of the structure. <br />Partial payment shall be calculated based on the ratio of work completed as listed in the Schedule <br />of Values. <br />Bid Item 10 - 8 MG PRESTRESSED CONCRETE RESERVOIR (AWWA D110, <br />TYPE I) & ACCESSORIES <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid price for this bid item shall be full compensation for all costs associated with <br />furnishing the tools, labor, equipment, and materials necessary or incidental for the following: <br />a. The post -tensioned concrete reservoir. Including the foundation, walls, roof and support <br />columns, interior and exterior staircase pipe penetrations, hatches, vents, railing, connection <br />of the water piping, cleaning, disinfection, treatment. and disposal of chlorinated water used <br />for disinfection, bacteriological testing, structural testing, other testing, all in a manner <br />acceptable to the Engineer. <br />b. Dewatering and water treatment. <br />c. Protection of the structure, cleaning, coatings, liners and geotextiles. <br />d. Hydrodynamic mixing system inside the reservoir. <br />e. DOSA dechlorination system. <br />f. Overflow piping system. <br />g. Gage board. <br />h. Potholing and excavation required to determine exact depths and locations of other utilities. <br />i. Utility or light pole holding in conformance with the requirements of the applicable utility <br />including, if necessary, arranging for the power utility to hold poles and paying the associated <br />fees. <br />j. Clearing and grubbing and removal of existing surfacing. <br />k. Excavation, backfill, and compaction of imported soils, including extra depth required to clear <br />known buried utilities or other known obstacles. Includes removal of structures or <br />obstructions not specifically covered under other bid items. <br />I. Protection of existing monitoring wells and other existing facilities and systems. <br />m. LCP wages tracking process. <br />n. Respectful Worksite program. <br />o. Apprenticeship program. <br />Partial payment shall be calculated based on the ratio of work completed as listed in the Schedule <br />of Values. <br />Bid Item 11 - ZONE A ONSITE SPOILS STOCKPILING <br />Measurement and Payment: Cubic Yard (CY ) <br />The bid item includes all costs associated with furnishing the tools, labor, equipment, and <br />materials necessary or incidental to do the following: <br />a. Zone A TESC measures for this site. <br />b. Grading and preparation for stockpile construction. <br />c. Liner. <br />d. Ecology blocks including reuse of City -provided Ecology blocks.. <br />e. Stockpile Zone A soils <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 22 00 <br />MEASUREMENT AND PAYMENT March 2024 <br />