Partial payments of the total bid item costs will be made for the lump sum contract price based on <br />milestone completion of the work as follows: <br />Partial payment shall be calculated based on the ratio of work completed as listed in the Schedule <br />of Values. <br />Bid Item 20 - CHARLES AND TULALIP CUT/CAPS <br />Measurement and Payment: Each (EA) <br />The lump sum bid price for this bid item shall be full compensation for all costs associated with <br />furnishing the tools, labor, equipment, and materials necessary or incidental for the following: <br />1. Excavation and pipe system cut/caps. <br />2. Shoring systems <br />3. Welding, weld testing, and joint testing <br />4. Install, pressure test, and inspection of pipe system <br />5. Restrained joints including all caps, plugs. <br />6. Traffic control <br />7. Pipe anchors, temporary and permanent thrust blocking and dead man blocks, and temporary <br />and permanent restraint systems <br />8. Maintenance, restoration and/or relocation, if required, of existing water mains, electrical <br />systems, and culverts, storm drainage pipe, other utilities and structures affected by <br />construction <br />9. Flushing, cleaning, bacteriological testing, and disinfection <br />10. Trench excavation, backfill, steel plates, etc. <br />11. All other work in this area, will be paid under this bid item. <br />Partial payments of the total bid item costs will be made for the lump sum contract price based on <br />milestone completion of the work as follows: <br />1. A total of 15% of the total bid cost will be made based upon required material submittal and <br />acceptance, plus preparation, submittal and permitting of the traffic control plans. <br />2. The remainder of the payment will be made for completion of cleaning, disinfection and <br />acceptance of the work. <br />Partial payment shall be calculated based on the ratio of work completed as listed in the Schedule <br />of Values. <br />Bid Item 21 - LAUREN VALVE CONNECTION <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid price for this bid item shall be full compensation for all costs associated with <br />furnishing the tools, labor, equipment, and materials necessary or incidental for the following: <br />1. Excavation and pipe system installation <br />2. Shoring systems <br />3. Welding, weld testing, and joint testing <br />4. Install, pressure test, and inspection of pipe system <br />5. Restrained joints including all fittings and valves, including taps, tees, crosses, reducers, <br />couplings, flanges, flanged coupling adapters, and sleeves <br />6. Traffic control <br />7. Detectable Marking Tape (tracer wire) above the pipes. <br />8. Pipe anchors, temporary and permanent thrust blocking and dead man blocks, and temporary <br />and permanent restraint systems <br />9. Ethafoam pads or sand backfill between these installations and any existing watermains or <br />other utilities encountered. <br />10. Maintenance, restoration and/or relocation, if required, of existing water mains, electrical <br />systems, and culverts, storm drainage pipe, other utilities and structures affected by <br />construction <br />11. Abandonment and/or removal of existing pipes including cutting, draining and properly <br />disposing, and plugging abandoned pipe at each end with a minimum of 2-feet of Commercial <br />concrete or CDF <br />12. Flushing, cleaning, bacteriological testing, and disinfection <br />13. Trench excavation, pipe bedding and backfill, steel plates, etc. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 22 00 <br />MEASUREMENT AND PAYMENT March 2024 <br />