My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Partial payment shall be calculated based on the ratio of work completed as listed in the Schedule <br />of Values. <br />Bid Item 24 - RECORD DRAWINGS <br />Measurement and Payment: Lump Sum (LS) with a minimum of 1% of the total bid, before taxes. <br />The lump sum bid shall include the complete cost of providing all mark-up drawings necessary for <br />the Owner to create accurate record drawings. Record Drawings shall be maintained throughout <br />the Project duration. Owner may request copies once a month to verify status. <br />Partial payments will be made for the lump sum contract price for "Record Drawings" as follows: <br />Partial payment for shall be calculated based on the ratio of work completed as listed in the <br />Schedule of Values for 75% of this bid item. <br />The remaining 25% shall be paid after submittal and approval of the final Record Drawings. <br />Bid Item 25 - FORCE ACCOUNT <br />Measurement and Payment: Force Account (FA) <br />This Force Account bid item shall be accomplished in accordance with the Section 00 72 00, <br />General Conditions, Article 9.6 except as modified below. <br />The Force Account bid item has been included for any additional work directed by the Engineer <br />that is not required by the original contract. The amount indicated in the proposal for this bid item <br />is to provide a common bid amount for all bidders. The actual amount paid under this bid item may <br />vary from no payment to the full amount for the bid item. Work performed under this bid item will <br />be initiated with a work directive issued by the Engineer. <br />In lieu of the preceding prescribed method of determining payment for force account work, payment <br />may be made at unit prices or lump sum prices agreed to by the Engineer and the Contractor prior <br />to beginning Force Account work. <br />END OF SECTION <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 22 00 <br />MEASUREMENT AND PAYMENT March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.