My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
4. Activity Assignments and Designations: <br />a. Limit activities, where possible, excluding fabrication of materials and equipment, to <br />durations not longer than 20 days. Activities shall be definable and measurable. For <br />example, an activity described only as "Concrete" will likely be unacceptable. <br />b. Assign to each activity an appropriate, unique numerical designation and description. <br />c. Numerical designation shall incorporate the associated Specifications section number. <br />d. Activity description shall include sufficient detail to clearly communicate the intended <br />activity. Descriptions shall include identifiers for physical locations of work area or work <br />system, such as column lines, stationing, and elevations. Indicate unique description <br />for each activity. <br />e. Group deliveries of materials and equipment into a separate sub -schedule that is part <br />of the Progress Schedule. <br />f. Group construction into work area sub -schedules that are part of the Progress <br />Schedule by activity. <br />g. Clearly indicate, as activities separate from installation, necessary and required curing <br />periods. <br />5. Organization of Progress Schedules: <br />a. Indicate interfaces and dependencies with preceding, concurrent, and follow-on <br />activities, including those associated with the Work, other contractors at the Site, <br />Owner and the cellular tower company, and AWWD, Owner's consultants, authorities <br />having jurisdiction, and others as appropriate. Clearly indicate activities not under <br />Contractor's control. <br />b. Progress Schedules shall be CPM Progress Schedules. <br />c. Indicate on the separate Schedule of Submittals dates for submitting and reviewing <br />Shop Drawings, product data submittals, Samples, and other required submittals. <br />Coordinate Progress Schedule with the Schedule of Submittals. <br />d. Clearly indicate the critical path on the Progress Schedule. <br />B. Planned Work Schedule: <br />1. Within 30 days of the Effective Date of the Contract, indicate to Engineer the work days <br />and hours proposed by Contractor. Also indicate planned non -work days, such as <br />Contractor's holidays, weekends, etc. <br />2. Enforce subcontractors' and suppliers' when at the Site for compliance with Contractor's <br />work schedule accepted by the Engineer. <br />3. In the event of changes, submit to Engineer a revised work schedule. Furnish such <br />submittal not less than three days prior to changing Contractor's work schedule, except in <br />event of unanticipated emergency. <br />C. Preliminary Progress Schedule: <br />1. Within ten days after the Contract Times commence running, Contractor shall submit to <br />Engineer the preliminary Progress Schedule covering the entire Project, with associated <br />schedule -related submittals. <br />2. Submit preliminary Progress Schedule in its native (executable) format generated by the <br />scheduling software, transmitted in accordance with electronic communication protocols. <br />D. Initial Acceptance of Progress Schedule: <br />1. Not less than 10 days before submission of the first application for Payment, a scheduling <br />conference attended by Contractor, Progress Schedule preparer, Engineer, and others as <br />appropriate will be held at the Site to review for acceptability to Engineer the preliminary <br />Progress Schedule and associated schedule -related submittals. Following the scheduling <br />conference, Contractor shall have five days to make corrections and adjustments and to <br />complete and resubmit the Progress Schedule and associated schedule -related submittals. <br />Contractor will not be eligible for first progress payment until acceptable Progress Schedule <br />and associated schedule -related Submittals are submitted to and accepted by the <br />Engineer. <br />2. Submit acceptable Progress Schedule, together with associated schedule -related <br />submittals per Section 01 31 26 — Electronic Communication Protocols, and Section 01 33 <br />00 - Submittal Procedures. Also submit acceptable form of Progress Schedule in its native <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 32 16 <br />CONSTRUCTION PROGRESS SCHEDULE March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.