My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
a. Submit time impact analysis with Change Proposal per Contract modification <br />procedures. <br />b. When time impact analysis is not part of a Change Proposal, submit each time impact <br />analysis within 10 days after the following, as applicable: <br />1) Start of the delay. <br />2) After Contractor's receipt of Work Change Directive. <br />c. When Contractor does not submit time impact analysis for a specific change or delay, <br />within the specified period for such submittal, such non -submittal will indicate extension <br />of the Contract time is not needed. <br />B. Evaluation by Engineer: <br />1. Engineer's evaluation of each time impact analysis comprised of complete information will <br />be completed in timely manner after Engineer's receipt. <br />2. When time impact analysis is incomplete or otherwise inappropriate, Engineer will furnish <br />comments to Contractor. When time impact analysis is complete and apparently <br />appropriate, its acceptability will be indicated by associated Contract modification or <br />allowance authorization. <br />3. Changes in the Contract time will be made only by Change Order. <br />4. When mutual agreement is reached between the parties on effect of the change or delay in <br />the Project, incorporate into the next Progress Schedule update the associated changes <br />illustrating the influence of changes and delays. <br />1.12 RECOVERY SCHEDULES <br />A. General: <br />1. When updated Progress Schedule indicates the ability to comply with the Contract Times <br />falls 14 days or more behind schedule, and there is no excusable delay, Change Order, or <br />Work Change Directive to support an extension of the Contract time, Contractor shall <br />prepare and submit to Engineer the Contractor's recovery schedule. <br />2. Recovery schedule is a Progress Schedule demonstrating Contractor's plan to accelerate <br />the Work to achieve compliance with the Contract time. If achieving the Contract time is <br />not feasible, Contractor's recovery schedule shall indicate Contractor's plan to recover as <br />much of the lost time as possible to complete the Work as close as possible to the Contract <br />time. <br />3. Submit recovery schedule within 7 days after submittal of updated Progress Schedule <br />where need for recovery schedule is indicated. <br />B. Recovery Schedule Report: <br />1. With each recovery schedule submittal, include recovery schedule narrative report, <br />prepared by Contractor indicating name of person responsible for preparing the recovery <br />schedule and report. <br />2. Recovery schedule report shall indicate Contractor's plan for accelerating the Work and <br />recovering lost time and shall indicate the total number of days expected to be recovered <br />by Contractor's implementation of the recovery schedule. Clearly indicate how the <br />intended actions will recover lost time. <br />3. Contractor is fully responsible for complying with the Contract Documents, including the <br />Contract time. <br />C. Implementation of Recovery Schedule: <br />1. At no additional cost to Owner, do one or more of the following, as appropriate: (a) furnish <br />additional labor, (b) provide additional construction equipment and machinery, (c) provide <br />suitable materials to accelerate the Work, (d) employ additional work shifts, (e) expedite <br />procurement of materials and equipment to be incorporated into the Work or otherwise <br />expedite delivery of such items, (f) provide other needed resources, and (g) provide other <br />measures necessary to complete the Work within the Contract time. <br />2. Upon acceptance of Recovery Schedule by Engineer, incorporate Recovery Schedule into <br />the next Progress Schedule update. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 32 16 <br />CONSTRUCTION PROGRESS SCHEDULE March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.