My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
8.6. Demonstration of Compliance with Contract Requirements 27 <br />8.6.1. Inspection 27 <br />8.6.2. Samples of Materials 28 <br />8.6.3. Certification 28 <br />8.6.4. Inspection at Point of Manufacturing 28 <br />8.6.5. Testing and Commissioning of Completed Work 28 <br />8.6.6. Storage of Materials and Equipment 28 <br />8.6.7. Manufacturer's Directions 28 <br />8.7. Defective Work 29 <br />8.7.1. Correction of Defective Work 29 <br />8.7.2. Retention of Defective Work 29 <br />8.8. Materials and Equipment Furnished by Owner 29 <br />8.9. Guarantee 29 <br />8.10. Correction Period 30 <br />9. MEASUREMENT AND PAYMENT 31 <br />9.1. Payments to Contractor 31 <br />9.1.1. Schedule of Values 31 <br />9.1.2. Progress Payments 31 <br />9.1.2.1 Payment Request Procedures. 31 <br />9.1.2.2 Review Procedures: 31 <br />9.1.2.3 Retained Percentage 32 <br />9.1.2.4 Withholding 32 <br />9.1.3. Final Payment 32 <br />9.2. Payment for Changes 33 <br />9.2.1. Changes in Estimated Quantities of Unit Price Work 33 <br />9.2.1.1. Increased Quantities 33 <br />9.2.1.2. Decreased Quantities 33 <br />9.2.1.3. Limitations 34 <br />9.2.2. Changes in Work Not Covered By Unit Prices 34 <br />9.2.3. Deleted Work 34 <br />9.3. Charges to Contractor 35 <br />9.4. Compensation to Owner for Time Extension 35 <br />9.5. Adjustment of Contract Sum 35 <br />9.5.1 Calculation 35 <br />9.5.2 Limitations 35 <br />9.5.3 Unabsorbed and Extended Overhead 36 <br />9.6. Force Account 37 <br />9.6.1 Labor 37 <br />9.6.2. Materials. 38 <br />9.6.3. Equipment 38 <br />9.6.4. For Services. 38 <br />9.6.5. For Mobilization. 39 <br />9.6.6. For Contractor Markup on Subcontractor's Work. 39 <br />9.7. Retainage 40 <br />10. NOTICE TO OWNER 41 <br />10.1 When Notice Must Be Given 41 <br />Reservoir 3 Replacement Phase 1 GENERAL CONDITIONS March 2024 <br />Work Order No. UP3739 00 72 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.