Laserfiche WebLink
EXHIBIT A – SCOPE OF WORK <br />13 <br /> <br />● Similar programs <br />● Engineering procedures (data collection, calculations, analysis, engineering judgment) <br />● Required data elements (crash history, prevailing speed, existing speed limit, roadway <br />conditions) <br />● Tools to be consulted and considered (USLIMITS2, NCHRP 966, etc.) <br />● Minimum length of speed zones <br />● Special conditions (school zones, work zones) <br />● Speed limit sign placement (where, how frequently) <br />CONSULTANT will prepare Tech Memo 3C: Posted Speed Limit Policy Recommendations. <br />CONSULTANT will present the first draft (v01) Tech Memo 3C to CITY for review and comment. <br />CONSULTANT will prepare a comment summary and response matrix and submit the draft final <br />Tech Memo 3C (v02) to CITY. <br />Upon completion of draft final, CONSULTANT will work with the CITY to identify two (2) case <br />study corridors to implement the recommended methodology to determine real-world <br />suggested posted speed limits. <br />Upon CITY review and comments on draft final Tech Memo (v02) and the case study, <br />CONSULTANT will prepare Final Tech Memo. <br />CONSULTANT will provide example scope of work/activities to CITY to inform a SS4A Grant <br />Application (Supplemental Planning) to develop and implement a Speed Management Plan. The <br />Speed Management Plan, if funded by FHWA, would include development of a speed <br />management plan, including speed limits and infrastructure needs to achieve the speed limit <br />for an estimated forty (40) Major Arterials, Secondary Arterials, Conceptual Arterials, and <br />Collectors in City of Everett. Grant application will be prepared by CITY. <br />7.2.C Complete Streets Design Checklist Updates <br />CITY will provide CONSULTANT with existing Complete Streets checklist. <br />CONSULTANT will review the CITY Complete Streets design checklist. <br />CONSULTANT will develop recommendations to modernize the existing City of Everett <br />Complete Streets checklist. <br />CONSULTANT will prepare Tech Memo 3D: Complete Streets Checklist Updates. CONSULTANT <br />will present the draft Tech Memo 3D (v01) to CITY for review and comment. CONSULTANT will <br />prepare a comment summary and response matrix. <br />CONSULTANT will prepare draft Tech Memo 3D (v02) for Steering Team review and comment. <br />CONSULTANT will address one round of consolidated written comments from Steering Team. <br />CONSULTANT will prepare a comment summary and response matrix. <br />CONSULTANT will submit the final Tech Memo 3D to CITY.