My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 7/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 7/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 2:56:17 PM
Creation date
7/1/2024 2:55:26 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
7/1/2024
Council Approval Date
6/26/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Corey N. Hert
Subject / Project Title
Safe Streets and Roads for All Safety Action Plan
Tracking Number
0004412
Total Compensation
$985,451.97
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A – SCOPE OF WORK <br />14 <br /> <br />Task 7.3 Steering Team Presentations <br />The CONSULTANT will prepare and present at up to three (3) SAP Steering Team meetings (at <br />regularly-scheduled monthly meetings) to share the findings and recommendations from Task 7 <br />activities. <br />Task 7 Deliverables <br />● 7.1 Policy Review Tech Memo (draft v01, v02, final; up to 6 pages; MS Word format); <br />comment summary and response matrix (one final) <br />● 7.2 Neighborhood Traffic Calming Tech Memo (draft and final; up to 10 pages; MS Word <br />format); comment summary and response matrix (one final ) <br />● 7.2 Posted Speed Limit Policy Recommendations Tech Memo (draft v01, draft v02, and <br />final; up to 15 pages, not including appendices; MS Word format); comment summary <br />and response matrix (one final) <br />● 7.2 Complete Streets Updates Tech Memo (draft and final; up to 8 pages; MS Word <br />format); comment summary and response matrix (one final) <br />● 7.3 PowerPoint Presentations (draft and final; up to 10 slides each); deliver the <br />presentations to Steering Committee. <br />Task 8. Strategy and Project Type Recommendations <br />Purpose: Recommend and prioritize strategies and project types, considering equity in impacts and <br />benefits, and drawing from FHWA Proven Safety Countermeasures, and NHTSA Countermeasures That <br />Work. <br />8.1 RECOMMENDED STRATEGIES AND COUNTERMEASURES <br />CONSULTANT will identify recommended strategies and countermeasures to reduce fatalities <br />and serious injuries associated with crash types/conditions identified in the safety analysis. <br />Strategies may draw from FHWA Proven Safety Countermeasures and will include low -cost <br />improvements that could be implemented at multiple locations within the City. <br />8.1.1 Top-10 “Typical” Project Sheets <br />CONSULTANT will prepare up to 10 “typical” information sheets for the highest priority <br />strategies to illustrate the potential strategies and project types. <br />8.1.2 Project Information Sheets (20 locations) <br />CONSULTANT will prepare Project Information Sheets for up to 2 0 locations (intersections or <br />corridors) within City of Everett that represent potential high-priority safety improvement <br />projects. Project Information sheets will include potential countermeasures, location exhibit (on <br />aerial base depicting segment limits), risk factors, crash history, high-level planning cost, and <br />potential crash reduction effectiveness. <br />CONSULTANT will collect the following traffic data to inform Project Information Sheets: <br />• Peak period (AM, MD, PM) intersection turning movement counts at up to 40 <br />intersections (two intersections per Project Information Sheet) <br />• Daily traffic (24-hour count) to include speed, volume, and classification at up to 20 <br />locations (1 location per Project Information Sheet)
The URL can be used to link to this page
Your browser does not support the video tag.