My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 7/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 7/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 2:56:17 PM
Creation date
7/1/2024 2:55:26 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
7/1/2024
Council Approval Date
6/26/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Corey N. Hert
Subject / Project Title
Safe Streets and Roads for All Safety Action Plan
Tracking Number
0004412
Total Compensation
$985,451.97
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A – SCOPE OF WORK <br />15 <br /> <br />8.2 SAP Workshop #3 <br />CONSULTANT will plan for and conduct SAP Workshop #3. The purpose of SAP Workshop #3 is <br />to discuss and solicit input on: <br />● Recommended Strategies and Countermeasures <br />● Policy and Process Changes <br />8.3 TECH MEMO: RECOMMENDED STRATEGIES AND COUNTERMEASURES <br />Based on input received at the SAP Workshop #3, CONSULTANT will document findings in Tech <br />Memo: Recommended Strategies and Countermeasures (MS Word format). <br />CONSULTANT will present draft Tech Memo #2 (v01) to CITY for review and comment. <br />CONSULTANT will prepare a comment summary and response matrix. <br />CONSULTANT will address one round of consolidated written comments from City of Everett. <br />CONSULTANT will present draft Tech Memo #2 (v02) to Steering Team for review and <br />comment. <br />CONSULTANT will address one round of consolidated written comments from Steering Team. <br />CONSULTANT will prepare a comment summary and response matrix. <br />CONSULTANT will submit draft Tech Memo #2 (v03) to Steering Team. <br />CONSULTANT will update Tech Memo #2 based on input received at the SAP Workshop #3 (Task <br />8.2). <br />CONSULTANT will prepare a comment summary and response matrix. <br />CONSULTANT will submit a Final Tech Memo #2 (v04) to City of Everett and Steering Team. <br />Deliverables: Tech Memo #2: Recommended Strategies and Countermeasures (MS Word <br />format). SAP Workshop #3; comment summary and response, invitations, agendas, and meeting <br />summaries as applicable <br />Task 9. Draft and Final SAP Report, Safety Resolution, Safety Workshop <br />9.1 DRAFT SAP REPORT <br />CONSULTANT will prepare a draft SAP summarizing previous analysis and findings, <br />countermeasures and proposed projects, and prioritization. Draft Report will include chapters <br />summarizing analysis and recommendations. <br />CONSULTANT will submit the draft SAP Report (v01), MS Word Format) to CITY for review and <br />comment. <br />CITY will provide one set of consolidated written comments. <br />CONSULTANT will prepare the draft Report (v02, Adobe InDesign format) reflecting CITY <br />comments. <br />CONSULTANT will submit the draft SAP Report to the Steering Team for review and comment. <br />Steering Team will provide written comments.
The URL can be used to link to this page
Your browser does not support the video tag.