Laserfiche WebLink
City of Everett 00 21 13 - 8 <br /> <br /> <br />00 21 13 - 8 INSTRUCTIONS TO BIDDERS <br /> <br />2. Bid Signature Sheet: To be filled in and signed by the Bidder. <br />3. Subcontractors Form: To be filled in by the Bidder. <br />4. Bid Security: This form is to be executed by the Bidder and the surety company <br />unless Bid is accompanied by a certified or cashiers check. The amount of the <br />bond or cashiers check, which shall be not less than five percent of the Total Bid, <br />may be shown in dollars or on a percentage basis. <br />5. RCW 35.22.650 Certification: To be filled in and signed by the Bidder. <br />6. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. <br />B. Failure to complete and fully execute the aforementioned forms and to submit them with <br />the Bid may result in rejection of Bid. <br />C. The following forms are to be executed after the award of Contract: <br />1. Contract: This Contract to be executed by the successful Bidder in duplicate within <br />14 calendar days after the award date. <br />2. Payment and Performance Bonds: These forms are to be executed by the <br />successful Bidder and his surety company in triplicate. The amount of these bonds <br />shall be 100 percent of the Total Bid and shall be submitted with the Contract. <br />3. Proof of Insurance: Insurance certificates and endorsements shall be obtained <br />and maintained in force in accordance with SECTION 00 72 00, Part 15 “Liability <br />and Insurance”, of the Contract Documents. <br />4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must <br />file with each bond a certified and effectively dated copy of their Power of Attorney. <br />5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit <br />of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to <br />the Subcontractor shall be submitted to the Employment Standards Division, State <br />Department of Labor and Industries, Olympia, Washington. If the prime contract <br />is over $1,000,000, then Contractor also needs to submit L&I Form F700-164-000 <br />(Affidavit of Wages Paid EHB 2805 Addendum). <br />6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br />WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll <br />Form WH347) may use State of Compliance found on back of form. <br />7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH 348). Contractors, <br />Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall <br />attach the Statement of Compliance Form WH 348 to each payroll. <br />8. Approval of Subcontractors: Contractors shall request approval of Subcontractors <br />on a form provided by the City prior to their working on the Site. <br />9. Construction Progress Schedule: To be submitted as required by Section 00 72 <br />00, Part 5 “Progress and Completion”, of the Contract Documents by the <br />Contractor within ten calendar days, or such time as determined by the City, after <br />the date of receipt of Notice to Proceed. <br />10. Traffic Control Plan: Standard Traffic Control Plans are included in the City’s <br />Design and Construction Standards. If, and to the extent, such plans are not <br />sufficient, complete or adequate to support the Bidder’s planned means and <br />methods of performing the Work, the Bidder must develop an adequate, complete <br />and sufficient traffic control plan at its cost, that shall be submitted for the City’s <br />approval prior to construction. Deviation from the Standard Plans must be <br />submitted by the Contractor and approved by the City prior to construction. <br />11. Disposal Sites: Provide the City with the location of all disposal sites to be used, <br />and also provide copies of the permits and approvals for such disposal sites. The