Laserfiche WebLink
• • <br /> This is now included. The city permit staff at the in-person appointment on April 13, 2022 <br /> advised that the 2018 IRC does not require these to be hardwired as long as they are <br /> wirelessly interconnected. <br /> 6. The bathroom in the lower level appears to be constructed without permits and should <br /> be shown as new work. See comment 1 for more information. Bathrooms should specify <br /> exhaust fans including the minimum required performance rates per IRC Table <br /> M1505.4.4(1). <br /> See response to question #1; this is now shown as new work (Drawing 2). Exhaust fan <br /> location is added. <br /> 7. The proposed project appears to include the demolition of a bearing wall in the <br /> existing storage room. The modified load paths should comply with the prescriptive <br /> limitations of the IRC. Alternatively, an engineered analysis and design may be <br /> performed per IRC Section R301.1.3; sealed and signed drawings and calculations <br /> prepared by a professional engineer licensed in the state of Washington are required per <br /> RCW 18.43.010, 18.43.020, and 18.43.070. The framing and foundation plans, and <br /> structural calculations as required, should show a complete load path. See IRC Section <br /> R301.1. <br /> This is not a load bearing wall. <br /> 8. Continuing with the previous comment, the exterior wall of the kitchen is being <br /> removed. Supporting framing should be specified on the plans. <br /> This is now added to the plans (Drawing #3). <br /> 9. Plans should show the framing requirements for the stair enclosure. <br /> This is now added to the plans (Drawing #3). <br /> 10. Plans should specify post size and provide a detail of the footing including any <br /> reinforcement. <br /> This is now added to the plans (Drawing#3). <br /> List of enclosures: <br /> - This response to comments <br /> - 2 copies of the drawings (4 drawings each set, 8 sheets total) <br /> - Revised letter from structural engineer, Peter Chopelas, including revised calculations <br /> for the deck and enclosure framing <br /> 313 <br />