My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Silver Shield Roofing & Construction, Inc. 7/4/2024 Change Order 1
>
Contracts
>
6 Years Then Destroy
>
2024
>
Silver Shield Roofing & Construction, Inc. 7/4/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2024 11:48:14 AM
Creation date
7/11/2024 11:48:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Silver Shield Roofing & Construction, Inc.
Approval Date
7/4/2024
End Date
9/3/2024
Department
Procurement
Department Project Manager
Bert Cueva
Subject / Project Title
WFP Gutter Replacement
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004343
Total Compensation
$2,224.25
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Silver Shield Roofing & Construction, Inc. 5/6/2024
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2024-059 WFP Gutter Replacement_CO1_0626 <br />2024_SD <br />Final Audit Report 2024-07-05 <br />Created:2024-06-28 <br />By:Marista Jorve (mjorve@everettwa.gov) <br />Status:Signed <br />Transaction ID:CBJCHBCAABAAMvhfSehkmr5bs2Hb31Caz43DMDotYByj <br />"2024-059 WFP Gutter Replacement_CO1_06262024_SD" Histo <br />ry <br />Document created by Marista Jorve (mjorve@everettwa.gov) <br />2024-06-28 - 9:42:52 PM GMT <br />Document emailed to Bert Cueva (bcueva@everettwa.gov) for approval <br />2024-06-28 - 9:43:45 PM GMT <br />Email viewed by Bert Cueva (bcueva@everettwa.gov) <br />2024-06-28 - 9:58:06 PM GMT <br />Email viewed by Bert Cueva (bcueva@everettwa.gov) <br />2024-07-01 - 2:21:45 AM GMT <br />Document approved by Bert Cueva (bcueva@everettwa.gov) <br />Approval Date: 2024-07-01 - 2:27:30 PM GMT - Time Source: server <br />Document emailed to Silver Silver (silvershieldroofing@gmail.com) for signature <br />2024-07-01 - 2:27:32 PM GMT <br />Email viewed by Silver Silver (silvershieldroofing@gmail.com) <br />2024-07-01 - 3:18:42 PM GMT <br />Email viewed by Silver Silver (silvershieldroofing@gmail.com) <br />2024-07-03 - 7:52:52 PM GMT <br />Document e-signed by Silver Silver (silvershieldroofing@gmail.com) <br />Signature Date: 2024-07-03 - 10:00:37 PM GMT - Time Source: server <br />Document emailed to Tim Benedict (TBenedict@everettwa.gov) for approval <br />2024-07-03 - 10:00:39 PM GMT
The URL can be used to link to this page
Your browser does not support the video tag.