Laserfiche WebLink
Asbestos and Lead Inspection <br />Everett Parks and Facilities Department | Everett, Washington <br />July 2, 2024 | Terracon Proposal No. P81247400 <br />Facilities | Environmental | Geotechnical | Materials 5 <br /> <br /> <br /> <br />provided by the Client. If actual site conditions lead to additional fees, Terracon will contact <br />the Client for authorization prior to incurring those additional costs. <br />The analysis, comments, and recommendations presented in the final report will be based <br />on the information collected as described in this proposal. When requested by the Client, <br />Terracon may provide verbal or electronic (interim) information prior to completing the final <br />report. Terracon does not recommend sole reliance on interim information regarding the <br />results of the investigation. Due to time constraints, such information may be based upon <br />limited or incomplete information and data evaluation. Consequently, the content of the <br />final report takes precedence over any previously conveyed information. <br />It is our understanding that these building(s) and project are NOT considered “child- <br />occupied facilities” as defined by EPA regulation 40 CFR, Part 745. The results of the <br />sampling are not intended to be, nor should be, used for compliance with the EPA’s <br />Renovation, Repair, and Painting (RRP) Rule. <br />A reasonable effort will be made to identify and sample (where applicable) ACM and LCP as <br />described in the Scope of Services above; however, this does not imply a guarantee that all <br />possible locations of ACM and LCP will be identified, as certain building materials and or <br />ACM and LCP components may be outside of the project area, hidden below solid <br />substrates, within mechanical components, etc., or otherwise inaccessible. During future <br />maintenance, renovation and demolition operations, additional suspect ACM or LCP may be <br />uncovered. All suspect ACM should be treated as asbestos-containing until an AHERA- <br />accredited building inspector assesses the materials. <br />Regulated building material inspections are non-comprehensive and subject to many <br />limitations, including those presented above. Our inspection will consider risks pertaining to <br />the regulated building material; however, the inspection will be limited to only those <br />locations and materials assessed. The inspection is not designed to identify all potential <br />concerns or to eliminate all risks associated with demolition, material removal, construction, <br />or transferring of property title. Evaluation of other risks not specifically described in the <br />Scope of Work have not been included; for example: structural integrity; engineering loads; <br />electrical; mechanical; radon gas; slope stability; building settlement; and evaluation of <br />toxic and hazardous substances in, or in contact with, soil and groundwater. No warranty, <br />expressed or implied, is made. <br />5.0 COMPENSATION <br />Terracon will provide the services described in the Scope of Services above for the <br />estimated fee listed in the cover letter of this proposal. <br />This proposal is valid only if authorized within sixty (60) days from the listed proposal date. <br />If there is a need for a change in the scope of services or the terms and conditions <br />described in this proposal, please call us immediately.