My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
True North Consulting Group LLC 8/26/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
True North Consulting Group LLC 8/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 1:42:48 PM
Creation date
8/28/2024 1:38:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
True North Consulting Group LLC
Approval Date
8/26/2024
End Date
8/31/2026
Department
Procurement
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Everett Transit Security Threat Assessment
Tracking Number
0004488
Total Compensation
$108,075.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />sales@tncg.com CONSULTING MADE PERSONAL PAGE 31 OF 57 <br /> <br />TASK 6 - Conduct on-site security assessment for identified areas that will <br />include observation, data collection, and interviews with necessary <br />staff for physical security for: <br />a. Internal & External <br />b. Visit sites to examine and document existing conditions, <br />equipment, and infrastructure. <br />c. Conduct a review of physical security for facilities and open <br />areas, including supporting infrastructure and equipment, <br />video surveillance, access control, lighting, building entry/exit <br />areas, and other security equipment or systems as applicable. <br />d. Discuss recent security incidents and identify threats, risks, and <br />the likelihood of future security incidents based on input from <br />the City of Everett and local law enforcement personnel. <br />TASK 7 - Present results to staff for comments and feedback on the overall <br />process. <br />TASK 8 - Conduct assessment of existing network connectivity for security <br />systems. <br />a. Review communications and security systems and <br />configuration. <br />b. Assess capability to handle additional security equipment and <br />integration with the existing network. <br />c. Provide draft findings and recommendations. <br />TASK 9 - Review and discuss: <br />o Overall findings from on-site security assessment <br />o How existing physical and security technologies and location <br />placement(s) meet/do not meet the City of Everett <br />requirements, industry best practices, and regulatory <br />requirements <br />o Current security systems and/or equipment functionality <br />o Standards for future systems expansion and implementation <br />based on building(s) and locations <br />o Building modification needs
The URL can be used to link to this page
Your browser does not support the video tag.