My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
True North Consulting Group LLC 8/26/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
True North Consulting Group LLC 8/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 1:42:48 PM
Creation date
8/28/2024 1:38:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
True North Consulting Group LLC
Approval Date
8/26/2024
End Date
8/31/2026
Department
Procurement
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Everett Transit Security Threat Assessment
Tracking Number
0004488
Total Compensation
$108,075.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />sales@tncg.com CONSULTING MADE PERSONAL PAGE 33 OF 57 <br /> <br />b. Technical Memoranda included in the report will include the <br />following areas: <br />i. Visitor Management <br />ii. CCTV System <br />iii. Access and key controls <br />iv. Emergency Communications <br />v. Data, Monitoring, and Analytics <br />vi. Security Operations Center <br />TASK 2 - Review report with the City of Everett project staff, then make any <br />modifications necessary before submitting the final report with <br />cost estimates and recommended next steps. <br />Phase IV – Physical Security Implementation Plan Report and <br />Recommendations <br />TASK 1 - TNCG will provide a physical security implementation plan report <br />for the City of Everett that incorporates all findings and <br />recommendations from Phases I-III. The security master plan <br />report will provide full and clear descriptions of recommendations, <br />including size and number of units, layout of facilities, types of <br />materials, and design criteria. Cost estimates will include <br />construction costs and annual operating and maintenance costs. <br />The physical security implementation plan will also include the <br />identification of any cost savings through value engineering or <br />reduction of existing facilities and equipment. The report shall <br />follow the structure for the report and appendices outlined in the <br />RFP. <br />TASK 2 - As part of the comprehensive plan, TNCG will provide the City of <br />Everett with a ten-year plan to sustain and improve the City of <br />Everett security systems with annual budgets and a <br />comprehensive implementation plan that includes costs, priorities, <br />and schedules. <br />TASK 3 - Submit draft security master plan to the City of Everett project staff <br />for review and comment.
The URL can be used to link to this page
Your browser does not support the video tag.