Laserfiche WebLink
Section 01 29 73 SCHEDULE OF VALUES <br /> <br />City of Everett 01 29 73-4 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />1.07 COST CATEGORIES <br />A. Assign the following, making sum equal to total cost for each line item activity to <br />show initial costs of work activity and total installed cost. <br />1. Labor. <br />2. Equipment. <br />3. Material. <br />4. Subcontractor. <br />5. Overhead and Profit. <br />6. Total Cost. <br />B. Show total sum for each cost category as well as total cost for each work activity. <br />PART 2 : PRODUCTS <br />Not Used. <br />PART 3 : EXECUTION <br />Not Used. <br />END OF SECTION 01 29 73 <br />