IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 33 00 SUBMITTALS <br /> <br />City of Everett 01 33 00-4 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />1.03 CONTRACTOR’S SCHEDULE <br />A. The Contractor's construction schedules shall be prepared and submitted to the <br />City. <br />1.04 SAMPLES <br />A. Whenever samples are required by the Specifications, the Contractor shall <br />submit not less than 3 samples of each item or material to the City for <br />acceptance at no additional cost to the Owner. <br />B. Samples, as required herein, shall be submitted for acceptance a minimum of 10 <br />working days prior to ordering such material for delivery to the jobsite, and shall <br />be submitted in an orderly sequence so that dependent materials or equipment <br />can be assembled and reviewed without causing delays in the work. <br />C. All samples shall be individually and indelibly labeled or tagged, indicating <br />thereon all specified physical characteristics and Manufacturer's name for <br />identification and submitted to the City for acceptance. Upon receiving <br />acceptance of the City, one set of the samples will be stamped and dated by the <br />City and returned to the Contractor, and one set of samples will be retained by <br />the City, and one set of samples shall remain at the job site until completion of <br />the Work. <br />1.05 OWNER’S MANUALS (TECHNICAL MANUALS) <br />A. The Contractor shall submit technical operation and maintenance information for <br />each item of mechanical, electrical and instrumentation equipment they furnish <br />(Owner furnished equipment not included), in an organized manner in the <br />Owner's manual. It shall be written so that it can be used and understood by the <br />Owner's operation and maintenance staff. <br />B. The Owner's manual shall be subdivided first by specification section number; <br />second, by equipment item; and last, by “Part.” Specification section subdivisions <br />shall be separated using pre-printed dividers, and types of equipment within each <br />section shall be separated using a goldenrod-colored sheet bearing the <br />equipment name. “Parts” shall conform to the following (as applicable): <br />1. Part 1 - Equipment Summary: <br />a. Summary: A summary table shall indicate the equipment name, <br />equipment number, and process area in which the equipment is <br />installed. <br />b. Form: The City will supply an Equipment Summary Form for each <br />item of mechanical, electrical and instrumentation equipment in <br />the work. The Contractor shall fill in the relevant information on the <br />form and include it in Part 1. <br />2. Part 2 - Operational Procedures: <br />a. Procedures: Manufacturer-recommended procedures on the <br />following shall be included in Part 2: <br />1) Installation