My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 33 00 SUBMITTALS <br /> <br />City of Everett 01 33 00-5 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />2) Adjustment <br />3) Startup <br />4) Location of controls, special tools, equipment required, or <br />related instrumentation needed for operation <br />5) Operation procedures <br />6) Load changes <br />7) Calibration <br />8) Shutdown <br />9) Troubleshooting <br />10) Disassembly <br />11) Reassembly <br />12) Realignment <br />13) Testing to determine performance efficiency <br />14) Tabulation of proper settings for all pressure relief valves, <br />low and high pressure switches, and other protection <br />devices <br />15) List of all electrical relay settings including alarm and <br />contact settings <br />3. Part 3 - Preventive Maintenance Procedures: <br />a. Procedures: Preventive maintenance procedures shall include all <br />manufacturer-recommended procedures to be performed on a <br />periodic basis, both by removing and replacing the equipment or <br />component, and by leaving the equipment in place. <br />b. Schedules: Recommended frequency of preventive maintenance <br />procedures shall be included. Lubrication schedules, including <br />lubricant SAE grade, type, and temperature ranges, shall be <br />covered. <br />4. Part 4 - Parts List: <br />a. Parts List: A legible and original, un-faxed, complete parts list shall <br />be furnished, including a generic description and manufacturer's <br />identification number for each part. Addresses and telephone <br />numbers of the nearest supplier and parts warehouse shall be <br />included. <br />b. Drawings: Cross-sectional or exploded view drawings shall <br />accompany the parts list. <br />5. Part 5 - Wiring Diagrams: <br />a. Diagrams: Part 5 shall include complete internal and connection <br />wiring diagrams for electrical equipment items. <br />6. Part 6 - Shop Drawings: <br />a. Drawings: This part shall include approved shop or fabrication <br />drawings, complete with dimensions.
The URL can be used to link to this page
Your browser does not support the video tag.